Dynamic monitoring and control of a critical chain project based on phase buffer allocation
暂无分享,去创建一个
[1] Simone Göttlich,et al. A continuous buffer allocation model using stochastic processes , 2015, Eur. J. Oper. Res..
[2] Xiaoming Zhang,et al. Buffer sizing approach with dependence assumption between activities in critical chain scheduling , 2012 .
[3] Jeng-Fung Chen,et al. Evaluating teaching performance based on fuzzy AHP and comprehensive evaluation approach , 2015, Appl. Soft Comput..
[4] Zhang Xiao-ming. Setting Distributed Capacity Constraint Buffer in Critical Chain Multi-Project Scheduling , 2013 .
[5] Erik Demeulemeester,et al. Effective expediting to improve project due date and cost performance through buffer management , 2015 .
[6] Rong-Kwei Li,et al. Enhancement of Theory of Constraints replenishment using a novel generic buffer management procedure , 2003 .
[7] Jian Zuo,et al. Application of Innovative Critical Chain Method for Project Planning and Control under Resource Constraints and Uncertainty , 2010 .
[8] Hazar Dib,et al. Structural Equation Model of Building Information Modeling Maturity , 2016 .
[9] Erik Demeulemeester,et al. Incorporation of activity sensitivity measures into buffer management to manage project schedule risk , 2016, Eur. J. Oper. Res..
[10] Thong Ngee Goh,et al. Production , Manufacturing and Logistics An effective approach for scheduling coupled activities in development projects , 2015 .
[11] Mani Poshdar,et al. A Probabilistic-Based Method to Determine Optimum Size of Project Buffer in Construction Schedules , 2016 .
[12] Xie Li. Reducing Plan Change: A Risk Driven Software Project Buffer Allocation Method , 2010 .
[13] Ario Ohsato,et al. Fuzzy critical chain method for project scheduling under resource constraints and uncertainty , 2008 .
[14] Robert C. Newbold,et al. Project Management in the Fast Lane: Applying the Theory of Constraints , 1998 .
[15] Junguang Zhang,et al. Optimisation of critical chain sequencing based on activities’ information flow interactions , 2015 .
[16] Willy Herroelen,et al. Project Scheduling—Theory and Practice , 2005 .
[17] Willy Herroelen,et al. Discussion of “Probabilistic Estimation and Allocation of Project Time Contingency” by Gabriel A. Barraza , 2013 .
[18] Junguang Zhang,et al. A new buffer sizing approach based on the uncertainty of project activities , 2015, Concurr. Eng. Res. Appl..
[19] Walter O. Rom,et al. An investigation of buffer sizing techniques in critical chain scheduling , 2006, Eur. J. Oper. Res..
[20] Sheng-Hung Chang,et al. Due-date performance improvement using TOC's aggregated time buffer method at a wafer fabrication factory , 2009, Expert Syst. Appl..
[21] Jamil Ahmad,et al. A Fuzzy AHP-TOPSIS Framework for the Risk Assessment of Green Supply Chain Implementation in the Textile Industry , 2015 .
[22] Xianming Cai,et al. Value stream mapping to reduce the lead-time of a product development process , 2015 .
[23] Eliyahu M. Goldratt,et al. Critical Chain: A Business Novel , 1997 .
[24] Chih-Hung Tsai,et al. A study of an enhanced simulation model for TOC supply chain replenishment system under capacity constraint , 2010, Expert Syst. Appl..
[25] Graham K. Rand. Critical chain: the theory of constraints applied to project management , 2000 .
[26] Elliot Bendoly,et al. Prioritizing and Monitoring Concurrent Project Work: Effects on Switching Behavior , 2014 .
[27] Junguang Zhang,et al. Dynamic monitoring and control of software project effort based on an effort buffer , 2015, J. Oper. Res. Soc..
[28] Qing Wang,et al. Reducing Plan Change: A Risk Driven Software Project Buffer Allocation Method: Reducing Plan Change: A Risk Driven Software Project Buffer Allocation Method , 2011 .
[29] Mario Vanhoucke,et al. A comparison of the performance of various project control methods using earned value management systems , 2015, Expert Syst. Appl..
[30] Chu Chun-chao. Buffer sizing and critical chain project management , 2008 .
[31] Öncü Haz,et al. A Review of Analytical Models , Approaches and Decision Support Tools in Project Monitoring and Control , 2014 .
[32] Willy Herroelen,et al. Project scheduling under uncertainty: Survey and research potentials , 2005, Eur. J. Oper. Res..
[33] Willy Herroelen,et al. On the merits and pitfalls of critical chain scheduling , 2000 .
[34] Tak Wing Yiu,et al. Integrated methodology to design and manage work-in-process buffers in repetitive building projects , 2013, J. Oper. Res. Soc..
[35] Maurizio Bevilacqua,et al. Critical chain and risk analysis applied to high-risk industry maintenance: A case study , 2009 .
[36] Erry Yulian Triblas Adesta,et al. Critical chain in project management , 2011 .
[37] Junguang Zhang,et al. Project buffer sizing of a critical chain based on comprehensive resource tightness , 2016, Eur. J. Oper. Res..
[38] Atul Agarwal,et al. Mitigating Behavioral Outcomes in a Multi-Project Environment: A Modified Ccpm Model , 2014 .
[39] Kai Yang,et al. Impacts of uncertain project duration and asymmetric risk sensitivity information in project management , 2016, Int. Trans. Oper. Res..
[40] Mohamed Ali Khemakhem,et al. Efficient robustness measures for the resource-constrained project scheduling problem , 2013 .