Well Completion for Effective Deliquification of Natural Gas Wells
暂无分享,去创建一个
[1] A. Dukler,et al. Analysis and Prediction of Minimum Flow Rate for the Continuous Removal of Liquids from Gas Wells , 1969 .
[2] Sen Li,et al. Experimental Study on Downhole Gas Liquid Separation and Produced-Water Reinjection , 2008 .
[3] Stephen A. Holditch,et al. Factors Affecting Water Blocking and Gas Flow From Hydraulically Fractured Gas Wells , 1979 .
[4] M. H. Sayyouh,et al. A New Approach for Accurate Prediction of Loading in Gas Wells Under Different Flowing Conditions , 2000 .
[5] Steve B. Coleman,et al. A New Look at Predicting Gas-Well Load-Up , 1991 .
[6] M. H. Sayyouh,et al. A New Approach for Accurate Prediction of Loading in Gas Wells Under Different Flowing Conditions , 1997 .
[7] James F. Lea,et al. Artificial-Lift Selection Strategy for the Life of a Gas Well With Some Liquid Production , 2008 .
[8] Randi Moe,et al. The dynamic two-fluid model OLGA; Theory and application , 1991 .
[9] Dennis Denney. Modeling the Gas-Well Liquid-Loading Process , 2006 .