MEDIUM TERM PRODUCTION PLANNING AND CAMPAIGN SCHEDULING FOR SAWMILL
暂无分享,去创建一个
[1] Jinxing Xie,et al. Freezing the master production schedule under single resource constraint and demand uncertainty , 2003 .
[2] Guillermo A. Mendoza,et al. Solution procedures for cutting lumber into furniture parts , 1994 .
[3] Thomas C. Maness,et al. Multiple Period Combined Optimization Approach to Forest Production Planning , 2002 .
[4] Dean H. Kropp,et al. THE EFFECTIVENESS OF EXTENDING THE HORIZON IN ROLLING PRODUCTION SCHEDULING , 1982 .
[5] Kenneth R. Baker,et al. AN EXPERIMENTAL STUDY OF THE EFFECTIVENESS OF ROLLING SCHEDULES IN PRODUCTION PLANNING , 1977 .
[6] Thomas C. Maness,et al. The Combined Optimization of Log Bucking and Sawing Strategies , 2007 .
[7] Shu-yin Zhang,et al. Modeling lumber recovery in relation to selected tree characteristics in jack pine using sawing simulator Optitek , 2005 .
[8] W. Wilhelm,et al. Strategic, tactical and operational decisions in multi-national logistics networks: A review and discussion of modelling issues , 2000 .
[9] M. Mesarovic,et al. Theory of Hierarchical, Multilevel, Systems , 1970 .
[10] W. C. Suter,et al. Rough mill policies and practices examined by a multiple-criteria goal program called ROMGOP , 1994 .
[11] Jorge Vera,et al. Scheduling production for a sawmill: A comparison of a mathematical model versus a heuristic , 2010, Comput. Ind. Eng..
[12] Philip A. Araman,et al. Combined Log Inventory and Process Simulation Models for the Planning and Control of Sawmill Operations , 1991 .
[13] V. Sridharan,et al. Alternative approaches for reducing schedule instability in multistage manufacturing under demand uncertainty , 1995 .
[14] Richard C. Larson,et al. Model Building in Mathematical Programming , 1979 .
[15] Mikael Rönnqvist,et al. Combined primary and secondary log breakdown optimisation , 1999, J. Oper. Res. Soc..
[16] R. Gomory,et al. A Linear Programming Approach to the Cutting-Stock Problem , 1961 .
[17] Pegah Sohrabi,et al. A THREE-STAGE CONTROL MECHANISM FOR THE LUMBER PRODUCTION PROCESS OF A SAWMILL BASED ON A POWERS-OF-TWO MODELLING APPROACH , 2013 .
[18] Suresh P. Sethi,et al. Forecast, Solution, and Rolling Horizons in Operations Management Problems: A Classified Bibliography , 2001, Manuf. Serv. Oper. Manag..
[19] Thomas C. Maness,et al. A Hierarchical Timber Allocation Model to Analyze Sustainable Forest Management Decisions , 2010, Math. Comput. For. Nat. Resour. Sci..
[20] Mikael Rönnqvist,et al. Optimization in forestry , 2003, Math. Program..
[21] M. Rönnqvist,et al. Dynamic Control of Timber Production at a Sawmill with Log Sawing Optimization , 2002 .
[22] Guy Berthiaume,et al. Bibliothèque et Archives nationales du Québec , 2014 .
[23] Eldon A. Gunn,et al. Scotsburn Dairy Group Uses a Hierarchical Production Scheduling and Inventory Management System to Control Its Ice Cream Production , 2014, Interfaces.
[24] Guillermo A. Mendoza,et al. A fractional algorithm for optimal cutting of lumber into dimension parts , 2000, Ann. Oper. Res..
[25] Masoumeh Kazemi Zanjani,et al. A multi-stage stochastic programming approach for production planning with uncertainty in the quality of raw materials and demand , 2010 .
[26] Mikael Rönnqvist,et al. Log sawing optimisation directed by market demands , 2001 .
[27] Arnoldo C. Hax,et al. Hierarchical integration of production planning and scheduling , 1973 .
[28] R. Anthony,et al. Planning and Control Systems: A Framework for Analysis , 1965 .
[29] Jonathan Gaudreaulta,et al. DISTRIBUTED OPERATIONS PLANNING IN THE SOFTWOOD LUMBER SUPPLY CHAIN: MODELS AND COORDINATION , 2010 .