MEDIUM TERM PRODUCTION PLANNING AND CAMPAIGN SCHEDULING FOR SAWMILL

[1]  Jinxing Xie,et al.  Freezing the master production schedule under single resource constraint and demand uncertainty , 2003 .

[2]  Guillermo A. Mendoza,et al.  Solution procedures for cutting lumber into furniture parts , 1994 .

[3]  Thomas C. Maness,et al.  Multiple Period Combined Optimization Approach to Forest Production Planning , 2002 .

[4]  Dean H. Kropp,et al.  THE EFFECTIVENESS OF EXTENDING THE HORIZON IN ROLLING PRODUCTION SCHEDULING , 1982 .

[5]  Kenneth R. Baker,et al.  AN EXPERIMENTAL STUDY OF THE EFFECTIVENESS OF ROLLING SCHEDULES IN PRODUCTION PLANNING , 1977 .

[6]  Thomas C. Maness,et al.  The Combined Optimization of Log Bucking and Sawing Strategies , 2007 .

[7]  Shu-yin Zhang,et al.  Modeling lumber recovery in relation to selected tree characteristics in jack pine using sawing simulator Optitek , 2005 .

[8]  W. Wilhelm,et al.  Strategic, tactical and operational decisions in multi-national logistics networks: A review and discussion of modelling issues , 2000 .

[9]  M. Mesarovic,et al.  Theory of Hierarchical, Multilevel, Systems , 1970 .

[10]  W. C. Suter,et al.  Rough mill policies and practices examined by a multiple-criteria goal program called ROMGOP , 1994 .

[11]  Jorge Vera,et al.  Scheduling production for a sawmill: A comparison of a mathematical model versus a heuristic , 2010, Comput. Ind. Eng..

[12]  Philip A. Araman,et al.  Combined Log Inventory and Process Simulation Models for the Planning and Control of Sawmill Operations , 1991 .

[13]  V. Sridharan,et al.  Alternative approaches for reducing schedule instability in multistage manufacturing under demand uncertainty , 1995 .

[14]  Richard C. Larson,et al.  Model Building in Mathematical Programming , 1979 .

[15]  Mikael Rönnqvist,et al.  Combined primary and secondary log breakdown optimisation , 1999, J. Oper. Res. Soc..

[16]  R. Gomory,et al.  A Linear Programming Approach to the Cutting-Stock Problem , 1961 .

[17]  Pegah Sohrabi,et al.  A THREE-STAGE CONTROL MECHANISM FOR THE LUMBER PRODUCTION PROCESS OF A SAWMILL BASED ON A POWERS-OF-TWO MODELLING APPROACH , 2013 .

[18]  Suresh P. Sethi,et al.  Forecast, Solution, and Rolling Horizons in Operations Management Problems: A Classified Bibliography , 2001, Manuf. Serv. Oper. Manag..

[19]  Thomas C. Maness,et al.  A Hierarchical Timber Allocation Model to Analyze Sustainable Forest Management Decisions , 2010, Math. Comput. For. Nat. Resour. Sci..

[20]  Mikael Rönnqvist,et al.  Optimization in forestry , 2003, Math. Program..

[21]  M. Rönnqvist,et al.  Dynamic Control of Timber Production at a Sawmill with Log Sawing Optimization , 2002 .

[22]  Guy Berthiaume,et al.  Bibliothèque et Archives nationales du Québec , 2014 .

[23]  Eldon A. Gunn,et al.  Scotsburn Dairy Group Uses a Hierarchical Production Scheduling and Inventory Management System to Control Its Ice Cream Production , 2014, Interfaces.

[24]  Guillermo A. Mendoza,et al.  A fractional algorithm for optimal cutting of lumber into dimension parts , 2000, Ann. Oper. Res..

[25]  Masoumeh Kazemi Zanjani,et al.  A multi-stage stochastic programming approach for production planning with uncertainty in the quality of raw materials and demand , 2010 .

[26]  Mikael Rönnqvist,et al.  Log sawing optimisation directed by market demands , 2001 .

[27]  Arnoldo C. Hax,et al.  Hierarchical integration of production planning and scheduling , 1973 .

[28]  R. Anthony,et al.  Planning and Control Systems: A Framework for Analysis , 1965 .

[29]  Jonathan Gaudreaulta,et al.  DISTRIBUTED OPERATIONS PLANNING IN THE SOFTWOOD LUMBER SUPPLY CHAIN: MODELS AND COORDINATION , 2010 .