Development of a modular mooring system with clump weights

Abstract Mooring systems constitute a fundamental component of all floating systems. For port authorities and device developers, improvements in moorings and foundations allow for savings in capital costs and increased revenues. In this work, a cost effective and secure mooring system for the station keeping of commercial vessels is presented and developed. A modular arrangement constituted by a series of connecting lines and clump weights is proposed, in order to allow for its deployment by small or craft vessels, and reduce the capital, installation and maintenance costs with respect to those of traditional mooring systems. The mooring system is calibrated according to the environmental conditions of Falmouth Harbour, UK. A numerical model of the mooring system is implemented using the offshore dynamics analysis software OrcaFlex. Experimental demonstration is provided through testing of a scaled prototype. Both numerical and experimental investigations aim at a preliminary evaluation of the design proposed. The outcomes indicate the feasibility of the arrangement as a suitable alternative to conventional and more expensive mooring systems. Further areas of improvement are identified and outlined.

[1]  Zhiming Yuan,et al.  Experimental study of a hybrid mooring system , 2015 .

[2]  David Nigel Parish A novel mooring tether for highly dynamic offshore applications , 2015 .

[3]  Jens Peter Kofoed,et al.  Screening of Available Tools for Dynamic Mooring Analysis of Wave Energy Converters , 2017 .

[4]  S. D. Weller,et al.  Synthetic mooring ropes for marine renewable energy applications , 2015 .

[5]  Chunyan Ji,et al.  Study on a new mooring system integrating catenary with taut mooring , 2011 .

[6]  R Taylor,et al.  Design Guide for Drag Embedment Anchors , 1984 .

[7]  Subrata Chakrabarti,et al.  Chapter 1 – Historical Development of Offshore Structures , 2005 .

[8]  Lars Johanning,et al.  Numerical model validation for mooring systems: Method and application for wave energy converters , 2015 .

[9]  S. D. Weller,et al.  Synthetic rope responses in the context of load history: The influence of aging , 2015 .

[10]  Hongbo Shu,et al.  A Historical Review on Integrity Issues of Permanent Mooring Systems , 2013 .

[11]  Jon Hardwick,et al.  A comprehensive assessment of the applicability of available and proposed offshore mooring and foundation technologies and design tools for array applications , 2014 .

[12]  Atilla Incecik,et al.  Numerical study on a hybrid mooring system with clump weights and buoys , 2014 .

[14]  Richard A. Skop Mooring Systems: A State-of-the-Art Review , 1988 .

[15]  Lars Johanning,et al.  Mooring systems for wave energy converters: A review of design issues and choices , 2004 .