A heuristic method for the estimation of the project duration in a stochastic network scheduling
暂无分享,去创建一个
[1] Sergio Cavallone. Auditing large plant engineering projects , 1987 .
[2] T. B. Boffey,et al. Applied Graph Theory , 1973 .
[3] Frederick S. Hillier,et al. Introduction of Operations Research , 1967 .
[4] H. Simon,et al. Reason in Human Affairs. , 1984 .
[5] Richard A. Kaimann,et al. Coefficient of Network Complexity , 1974 .
[6] Jan Magott,et al. Estimating the mean completion time of PERT networks with exponentially distributed durations of activities , 1993 .
[7] S. Elmaghraby. Chapter 1 – THE ESTIMATION OF SOME NETWORK PARAMETERS IN THE PERT MODEL OF ACTIVITY NETWORKS: REVIEW AND CRITIQUE , 1989 .