Overview and status of the Giant Magellan Telescope Project

The Giant Magellan Telescope Project is in the construction phase. Production of the primary mirror segments is underway with four of the seven required 8.4m mirrors at various stages of completion and materials purchased for segments five and six. Development of the infrastructure at the GMT site at Las Campanas is nearing completion. Power, water, and data connections sufficient to support the construction of the telescope and enclosure are in place and roads to the summit have been widened and graded to support transportation of large and heavy loads. Construction pads for the support buildings have been graded and the construction residence is being installed. A small number of issues need to be resolved before the final design of the telescope structure and enclosure can proceed and the GMT team is collecting the required inputs to the decision making process. Prototyping activities targeted at the active and adaptive optics systems are allowing us to finalize designs before large scale production of components begins. Our technically driven schedule calls for the telescope to be assembled on site in 2022 and to be ready to receive a subset of the primary and secondary mirror optics late in the year. The end date for the project is coupled to the delivery of the final primary mirror segments and the adaptive secondary mirrors that support adaptive optics operations.

[1]  Tyson Hare,et al.  Instrumentation progress at the Giant Magellan Telescope project , 2016, Astronomical Telescopes + Instrumentation.

[2]  Antonin Bouchez,et al.  Giant Magellan Telescope: overview , 2012, Other Conferences.

[3]  Ryan Danks,et al.  Initial computational fluid dynamics modeling of the Giant Magellan Telescope site and enclosure , 2016, Astronomical Telescopes + Instrumentation.

[4]  Bruce C. Bigelow,et al.  GMT azimuth bogie wheel-rail interface wear study , 2016, Astronomical Telescopes + Instrumentation.

[5]  George H. Jacoby,et al.  Status of the instrumentation program for the Giant Magellan Telescope , 2014, Astronomical Telescopes and Instrumentation.

[6]  Warren B. Davison,et al.  Production of primary mirror segments for the Giant Magellan Telescope , 2014, Astronomical Telescopes and Instrumentation.

[7]  Brooke Gregory,et al.  Preliminary results of the 2001-2002 Gemini sodium monitoring campaign at Cerro Tololo, Chile , 2002, SPIE Astronomical Telescopes + Instrumentation.

[8]  Tomas Chylek,et al.  Design of the Giant Magellan Telescope , 2014, Astronomical Telescopes and Instrumentation.

[9]  James H. Burge,et al.  Scanning pentaprism test for the GMT 8.4-m off-axis segments , 2010, Astronomical Telescopes + Instrumentation.

[10]  Ciro Del Vecchio,et al.  A Study of an Adaptive Secondary Mirror , 1994 .

[11]  D. L. DePoy,et al.  Science instrument development for the Giant Magellan Telescope , 2010, Astronomical Telescopes + Instrumentation.

[12]  D. Guzman,et al.  The GMT-CfA, Carnegie, Catolica, Chicago Large Earth Finder (G-CLEF): a general purpose optical echelle spectrograph for the GMT with precision radial velocity capability , 2012, Other Conferences.

[13]  Matt Johns Progress on the GMT , 2008, Astronomical Telescopes + Instrumentation.

[14]  Rafael Millan-Gabet,et al.  Overview and status of the Giant Magellan Telescope project , 2018, Astronomical Telescopes + Instrumentation.

[15]  Armando Riccardi,et al.  MMT adaptive secondary: performance evaluation and field testing , 2003, SPIE Astronomical Telescopes + Instrumentation.

[16]  Tom L. Zobrist,et al.  Laser tracker surface measurements of the 8.4 m GMT primary mirror segment , 2009, Optical Engineering + Applications.

[17]  Matt Johns,et al.  Giant Magellan Telescope site evaluation and characterization at Las Campanas Observatory , 2008, Astronomical Telescopes + Instrumentation.

[18]  Roberto Biasi,et al.  GMT adaptive secondary design , 2010, Astronomical Telescopes + Instrumentation.

[19]  Matt Johns,et al.  Giant Magellan Telescope primary mirror cells , 2010, Astronomical Telescopes + Instrumentation.

[20]  George H. Jacoby,et al.  The instrument development and selection process for the Giant Magellan Telescope , 2012, Other Conferences.

[21]  Matt Johns,et al.  GMT overview , 2010, Astronomical Telescopes + Instrumentation.

[22]  D. Scott Acton,et al.  The Giant Magellan Telescope adaptive optics program , 2012, Other Conferences.

[23]  Jeong-Yeol Han,et al.  Design and early performance of IGRINS (Immersion Grating Infrared Spectrometer) , 2014, Astronomical Telescopes and Instrumentation.

[24]  Tyson Hare,et al.  First closed-loop visible AO test results for the advanced adaptive secondary AO system for the Magellan Telescope: MagAO's performance and status , 2012, Other Conferences.

[25]  Dani Guzman,et al.  A preliminary design for the GMT-Consortium Large Earth Finder (G-CLEF) , 2014, Astronomical Telescopes and Instrumentation.

[26]  Scott Case,et al.  TAIPAN: optical spectroscopy with StarBugs , 2014, Astronomical Telescopes and Instrumentation.

[27]  R. Biasi,et al.  VLT deformable secondary mirror: integration and electromechanical tests results , 2012, Other Conferences.

[28]  James H. Burge,et al.  Measuring large mirrors using SCOTS: the Software Configurable Optical Test System , 2014, Astronomical Telescopes and Instrumentation.

[29]  Steve Gunnels The Giant Magellan Telescope (GMT): hydrostatic constraints , 2010, Astronomical Telescopes + Instrumentation.

[30]  Nicolas Buchschacher,et al.  Harps-N: the new planet hunter at TNG , 2012, Other Conferences.

[31]  Jeffrey D. Crane,et al.  The GMT-Consortium Large Earth Finder (G-CLEF): an optical Echelle spectrograph for the Giant Magellan Telescope (GMT) , 2016, Astronomical Telescopes + Instrumentation.

[32]  A. Bouchez,et al.  The GMT active optics control strategies , 2016, Astronomical Telescopes + Instrumentation.

[33]  Fernando Quirós-Pacheco,et al.  Performance of the Giant Magellan Telescope phasing system , 2016, Astronomical Telescopes + Instrumentation.

[34]  Tyson Hare,et al.  MagAO: Status and on-sky performance of the Magellan adaptive optics system , 2014, Astronomical Telescopes and Instrumentation.

[35]  Douglas R. Neill,et al.  Seismic analysis of the LSST telescope , 2012, Other Conferences.

[36]  Matthew Colless,et al.  The MANIFEST fibre positioning system for the Giant Magellan Telescope , 2014, Astronomical Telescopes and Instrumentation.

[37]  Matt Johns The Giant Magellan Telescope (GMT) , 2008, Extremely Large Telescopes.

[38]  Stephen A. Shectman,et al.  Progress on the structural and mechanical design of the Giant Magellan Telescope , 2012, Other Conferences.

[39]  T. Prochaska,et al.  An update on the wide field, multi-object, moderate-resolution, spectrograph for the Giant Magellan Telescope , 2014, Astronomical Telescopes and Instrumentation.

[40]  Michael Sheehan,et al.  GMT site: facilities and enclosure design overview , 2014, Astronomical Telescopes and Instrumentation.

[41]  Tyson Hare,et al.  IMACS: the wide-field imaging spectrograph on Magellan-Baade , 2006, SPIE Astronomical Telescopes + Instrumentation.

[42]  Patrick McCarthy,et al.  Giant Magellan Telescope site testing: PWV statistics and calibration , 2010, Astronomical Telescopes + Instrumentation.

[43]  Bruce C. Bigelow,et al.  A survey of enclosure suspension and rotation systems for 3-15m telescopes , 2016, Astronomical Telescopes + Instrumentation.

[44]  A. Riccardi,et al.  Deformable secondary mirrors for the LBT adaptive optics system , 2006, SPIE Astronomical Telescopes + Instrumentation.

[45]  Stephen A. Shectman,et al.  A prototype phasing camera for the Giant Magellan Telescope , 2012, Other Conferences.