Assembly line performance and modeling
暂无分享,去创建一个
[1] Bronislav Chramcov,et al. Heuristic Control of the Assembly Line , 2015, CSOC.
[2] Hadi Gökçen,et al. Binary integer formulation for mixed-model assembly line balancing problem , 1998 .
[3] R. J. Kuo,et al. Simulation optimization using particle swarm optimization algorithm with application to assembly line design , 2011, Appl. Soft Comput..
[4] Hamid Seifoddini,et al. Simulation Intelligence and Modeling for Manufacturing Uncertainties , 2006, Proceedings of the 2006 Winter Simulation Conference.
[5] J. Hair. Multivariate data analysis , 1972 .
[6] Kazem Abhary,et al. Optimisation of assembly scheduling in VCIM systems using genetic algorithm , 2017 .
[7] Hamid Davoudpour,et al. New scheduling rules for a dynamic flexible flow line problem with sequence-dependent setup times , 2017 .
[8] J. R. Jadhav,et al. Roadmap for Lean implementation in Indian automotive component manufacturing industry: comparative study of UNIDO Model and ISM Model , 2015 .
[9] Dong Ho Park,et al. Optimization of cost and downtime for replacement model following the expiration of warranty , 2008, Reliab. Eng. Syst. Saf..
[10] Oscar Cordón,et al. An advanced multiobjective genetic algorithm design for the time and space assembly line balancing problem , 2011, Comput. Ind. Eng..
[11] Peter van Beek,et al. Constraint-Based Vehicle Assembly Line Sequencing , 2001, Canadian Conference on AI.
[12] Hyunwoo Lee,et al. A Case Study in an Automotive Assembly Line: Exploring the Design Framework for Manufacturing Gamification , 2016 .
[13] David. Proverbs,et al. A systematic modelling and simulation approach for JIT performance optimisation , 2008 .
[14] Ann-Christine Falck,et al. A model for calculation of the costs of poor assembly ergonomics (part 1) , 2014 .