Solving a Fabrication Lot-Size and Shipping Frequency Problem with an Outsourcing Policy and Random Scrap

Operating in unstable and competitive globalized markets, management of today’s transnational enterprises continually searches for different alternatives to maintain product quality, streamline production activities, and reduce overall operating costs, particularly in their internal supply chain system. With the aim of revealing and offering insight information to support managerial decision making, this study explores the optimal replenishment lot-size and shipping frequency problem for an intra-supply chain system with a partial outsourcing policy and random scrap. In this study, the demand of a product is partially outsourced and partially fabricated by the production units, to release the workload of machine and smooth production schedule. During the fabrication process, a portion of random scrap items is produced, and finished products are distributed to sales locations using a multiple-shipment policy. The objective is to simultaneously determine an optimal fabrication lot-size and shipping frequency decisions that minimize the overall expected costs for such an intra-supply chain system. Mathematical modeling and optimization methods are used to solve the problem. Moreover, through the use of a numerical example and sensitivity analyses, various important insights with regard to the joint effects of the partial outsourcing policy and random scrap on the optimal solutions are revealed to support managerial decision making.

[1]  S. W. Chiu,et al.  REPLENISHMENT LOT SIZE AND NUMBER OF SHIPMENTS FOR EPQ MODEL DERIVED WITHOUT DERIVATIVES , 2011 .

[2]  Jeremy Jie Ming Kwok,et al.  Coopetitive Supply Chain Relationship Model: Application to the Smartphone Manufacturing Network , 2015, PloS one.

[3]  Wen-Na Ma,et al.  An optimal common production cycle time for imperfect production processes with scrap , 2010, Math. Comput. Model..

[4]  Leroy B. Schwarz,et al.  A Simple Continuous Review Deterministic One-Warehouse N-Retailer Inventory Problem , 1973 .

[5]  M.-F. Wu,et al.  A simplified approach to the multi-item economic production quantity model with scrap, rework, and multi-delivery , 2015 .

[6]  Biswajit Sarkar,et al.  An inventory model with reliability in an imperfect production process , 2012, Appl. Math. Comput..

[7]  Biswajit Sarkar,et al.  A production-inventory model with probabilistic deterioration in two-echelon supply chain management , 2013 .

[8]  Yuan-Shyi Peter Chiu,et al.  Mathematical modeling of a multi-product EMQ model with an enhanced end items issuing policy and failures in rework , 2015, SpringerPlus.

[9]  P. Chalos,et al.  Outsourcing Decisions and Managerial Incentives , 1998 .

[10]  Mehdi Safaei,et al.  An integrated multi-objective model for allocating the limited sources in a multiple multi-stage lean supply chain , 2014 .

[11]  Abdellah El Moudni,et al.  Production scheduling problem with delivery considerations in a mono-product supply chain environment to minimise the total joint cost , 2013 .

[12]  Yingjie Zhang,et al.  A machining process oriented modeling approach for reliability optimization of failure-prone manufacturing systems , 2016 .

[13]  Tripti Chakrabarti,et al.  An integrated multi-stage supply chain inventory model with imperfect production process , 2015 .

[14]  J. Gans,et al.  A Bargaining Perspective on Strategic Outsourcing and Supply Competition , 2007 .

[15]  H. Fergany Probabilistic multi-item inventory model with varying mixture shortage cost under restrictions , 2016, SpringerPlus.

[16]  F. Ciliberto,et al.  Outsourcing and Vertical Integration in a Competitive Industry , 2011 .

[17]  Singa Wang Chiu,et al.  On intra-supply chain system with an improved distribution plan, multiple sales locations and quality assurance , 2015, SpringerPlus.

[18]  Gyana R. Parija,et al.  An Optimal Batch Size for a Production System Operating Under a Fixed-Quantity, Periodic Delivery Policy , 1994 .

[19]  P. Patnaik,et al.  A Numerical Study on Deterministic Inventory Model for Deteriorating Items with Selling Price Dependent Demand and Variable Cycle Length , 2015 .

[20]  Viliam Makis Optimal lot sizing and inspection policy for an EMQ model with imperfect inspections , 1998 .

[21]  Chi Bin Cheng,et al.  Optimal production-shipment decisions for the finite production rate model with scrap , 2009 .

[22]  Nico Vandaele,et al.  A multi-criteria approach to robust outsourcing decision-making in stochastic manufacturing systems , 2016, Comput. Ind. Eng..

[23]  K. Nabeshima,et al.  A Defective Meiotic Outcome of a Failure in Homologous Pairing and Synapsis Is Masked by Meiotic Quality Control , 2015, PloS one.

[24]  Mohd Khairol Anuar Mohd Ariffin,et al.  A new method for decreasing cell-load variation in dynamic cellular manufacturing systems , 2016 .

[25]  B. Sarkar Supply Chain Coordination with Variable Backorder, Inspections, and Discount Policy for Fixed Lifetime Products , 2016 .

[26]  G. Ozdemir,et al.  An economic order quantity model with defective items and shortages , 2007 .

[27]  Y. P. Chiu,et al.  Simultaneous determination of production and shipment decisions for a multi-product inventory system with a rework process , 2016 .

[28]  Subhojit Ghosh,et al.  An improved fault detection classification and location scheme based on wavelet transform and artificial neural network for six phase transmission line using single end data only , 2015, SpringerPlus.

[29]  Ke Fu,et al.  Inventory and Production Decisions for an Assemble-to-Order System with Uncertain Demand and Limited Assembly Capacity , 2006, Oper. Res..

[30]  Robert W. Grubbström,et al.  The EOQ with backlogging derived without derivatives , 1999 .

[31]  Andy A. Tsay,et al.  Safeguarding the Promise of Production Outsourcing , 2006, Interfaces.

[32]  Morton J. M. Posner,et al.  Production-Inventory Systems with Unreliable Machines , 1994, Oper. Res..

[33]  Bibhas C. Giri,et al.  Joint effect of stock threshold level and production policy on an unreliable production environment , 2013 .

[34]  Aleda V. Roth,et al.  The influence of cost and quality priorities on the propensity to outsource production , 2010 .

[35]  Bhaba R. Sarker,et al.  Optimal production plans and shipment schedules in a supply-chain system with multiple suppliers and multiple buyers , 2009, Eur. J. Oper. Res..

[36]  Anil Arya,et al.  The Make-or-Buy Decision in the Presence of a Rival: Strategic Outsourcing to a Common Supplier , 2008, Manag. Sci..

[37]  izvirni znanstveni članek,et al.  The impact of technical and organisational innovation concepts on product characteristics , 2015 .

[38]  J.-S. Kuo,et al.  Effect of delayed differentiation on a multiproduct vendor-buyer integrated inventory system with rework , 2016 .

[39]  Thomas J. Howard,et al.  Production monitoring system for understanding product robustness , 2016 .

[40]  Byung-Cheon Choi,et al.  Two-stage production scheduling with an outsourcing option , 2011, Eur. J. Oper. Res..

[41]  Sharada Vadali,et al.  Buyer-Supplier Transport Access Measures for Industry Clusters , 2014 .

[42]  Patrick T. Harker,et al.  Competition and Outsourcing with Scale Economies , 2002, Manag. Sci..

[43]  S. Goyal,et al.  Integrated inventory models: The buyer-vendor coordination , 1989 .

[44]  Alex Coman,et al.  Production outsourcing: A linear programming model for the Theory-Of-Constraints , 2000 .

[45]  Izvirni znanstveni članek A hierarchical framework for index computation in sustainable manufacturing , 2015 .

[46]  Chih-Kai Chang,et al.  Optimization of a Multi–Product Intra-Supply Chain System with Failure in Rework , 2016, PloS one.

[47]  Hong-Dar Lin,et al.  Solving a vendor–buyer integrated problem with rework and a specific multi-delivery policy by a two-phase algebraic approach , 2014 .

[48]  Ali M. Zargar,et al.  Effect of rework strategies on cycle time , 1995 .

[49]  K R Kiron,et al.  Prioritizing the Factors Affecting Innovation Capability of Steel Manufacturing SMEs Using Fuzzy Logic , 2015 .

[50]  Zhao Yuqi,et al.  CO-EVOLUTION ANALYSIS ON COAL-POWER INDUSTRIES CLUSTER ECOSYSTEM BASED ON THE LOTKA-VOLTERRA MODEL: A CASE STUDY OF CHINA , 2015 .

[51]  Evan L. Porteus Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction , 1986, Oper. Res..

[52]  Jayashankar M. Swaminathan,et al.  The antecedents of process integration in business process outsourcing and its effect on firm performance , 2015, IEEE Engineering Management Review.

[53]  Dah-Chuan Gong,et al.  On an Economic Production Quantity Model with Two Unreliable Key Components Subject to Random Failures , 2014 .

[54]  M. Darwish,et al.  Production and shipment lot sizing in a vendor-buyer supply chain with transportation cost , 2007, Eur. J. Oper. Res..

[55]  Kai-Ling Mak Inventory control of defective products when the demand is partially captive , 1985 .

[56]  Prashant Jindala,et al.  Integrated supply chain inventory model with quality improvement involving controllable lead time and backorder price discount , 2016 .

[57]  Singa Wang Chiu,et al.  Cost Minimization for a Multi-product Fabrication-Distribution Problem with Commonality, Postponement, and Quality Assurance , 2016 .

[58]  Hsiao-Wen Wang,et al.  In-house capability and supply chain decisions , 2013 .

[59]  Singa Wang Chiu,et al.  Multi-product FPR model with rework and multi-shipment policy resolved by algebraic approach , 2015 .

[60]  Shib Sankar Sana,et al.  A production-inventory model in an imperfect production process , 2010, Eur. J. Oper. Res..

[61]  Dr. Syed Abdul Rehman Khan Usage of RFID Technology in Supply Chain : Benefits and Challenges , 2016 .