Integrated Planning of Production and Engineering Activities in Semiconductor Supply Chains: A Simulation Study
暂无分享,去创建一个
Hans Ehm | Timm Ziarnetzky | Thomas Ponsignon | Lars Mönch | L. Mönch | H. Ehm | Timm Ziarnetzky | Thomas Ponsignon
[1] Sukgon Kim,et al. Integrated Planning of Production and Engineering Process Improvement , 2008, IEEE Transactions on Semiconductor Manufacturing.
[2] Hans Ehm,et al. Rolling horizon planning with engineering activities in semiconductor supply chains , 2017, 2017 13th IEEE Conference on Automation Science and Engineering (CASE).
[3] Reha Uzsoy,et al. A survey of semiconductor supply chain models part III: master planning, production planning, and demand fulfilment , 2018, Int. J. Prod. Res..
[4] Lars Mönch,et al. Incorporating engineering process improvement activities into production planning formulations using a large-scale wafer fab model , 2016 .
[5] Robert W. Atherton,et al. Wafer Fabrication: Factory Performance and Analysis , 1995 .
[6] John W. Fowler,et al. Measurement and improvement of manufacturing capacities (MIMAC): Final report , 1995 .
[7] Reha Uzsoy,et al. Planning Wafer Starts Using Nonlinear Clearing Functions: A Large-Scale Experiment , 2013, IEEE Transactions on Semiconductor Manufacturing.
[8] Sang C. Park,et al. Reservation based dispatching rule for wafer FAB with engineering lots , 2015, 2015 Winter Simulation Conference (WSC).
[9] Claver Diallo,et al. A data-driven approach to multi-product production network planning , 2017, Int. J. Prod. Res..
[10] Reha Uzsoy,et al. Prioritising production and engineering lots in wafer fabrication facilities: a simulation study , 2011 .
[11] Reha Uzsoy,et al. Modeling and Analysis of Integrated Planning of Production and Engineering Process Improvement , 2013, IEEE Transactions on Semiconductor Manufacturing.
[12] Shu-Hsing Chung,et al. Cycle time estimation for wafer fab with engineering lots , 2002 .
[13] Reha Uzsoy,et al. SIMULATION OPTIMIZATION FOR PLANNING PRODUCT TRANSITIONS IN SEMICONDUCTOR MANUFACTURING FACILITIES , 2018, 2018 Winter Simulation Conference (WSC).
[14] Hans Ehm,et al. A Testbed for Simulating Semiconductor Supply Chains , 2017, IEEE Transactions on Semiconductor Manufacturing.