Multi-Stage Capital Budgeting with Delayed Consumption of Slack

Capital budgeting frequently involves multiple stages at which firms can continue or abandon ongoing projects. In this paper, we study a project requiring two stages of investment. Failure to fund Stage 1 of the investment precludes investment in Stage 2, whereas failure to fund Stage 2 results in early termination. In contrast to the existing literature, we assume that the firm can limit the manager's informational rents with the early termination of the project. In this setting, we find that the firm optimally commits to a capital allocation scheme whereby it forgoes positive net present value NPV projects at Stage 1 capital rationing, whereas at Stage 2, depending on the manager's previous report, it sometimes implements projects with a negative continuation NPV but in other situations forgoes implementing projects with positive continuation NPVs. This paper was accepted by Mary Barth, accounting.

[1]  Mathias Dewatripont,et al.  A theory of debt and equity: diversity of securities and manager-shareholder congruence , 1994 .

[2]  Gary D. Eppen,et al.  Capital Rationing and Organizational Slack in Capital Budgeting , 1985 .

[3]  R. Sundaram A First Course in Optimization Theory , 1996 .

[4]  Managerial Use of an Information System , 2009 .

[6]  Christopher M. Snyder,et al.  Is no news bad news? Information transmission and the role of ''early warning'' in the principal-agent model , 1997 .

[7]  Lawrence J. Gitman,et al.  A Survey of Capital Budgeting Techniques Used by Major U.S. Firms , 1977 .

[8]  P. Bolton,et al.  The firm as a communication network , 1994 .

[9]  Pierre Jinghong Liang,et al.  Essays in accounting theory in honour of Joel S. Demski , 2007 .

[10]  Joyce E. Berg,et al.  The role of information asymmetry in escalation phenomena: Empirical evidence , 2009 .

[11]  John C. Fellingham,et al.  Resource Rationing and Organizational Slack in a Two-Period Model , 1990 .

[12]  Doyoung Kim Capital budgeting for new projects: On the role of auditing in information acquisition , 2006 .

[13]  Thomas Pfeiffer,et al.  Residual Income-Based Compensation Plans for Controlling Investment Decisions Under Sequential Private Information , 2007, Manag. Sci..

[14]  Scott A. Richardson,et al.  Over-investment of free cash flow , 2006 .

[15]  Paul A. Gompers Optimal Investment, Monitoring, and the Staging of Venture Capital , 1995 .

[16]  Peter Bogetoft,et al.  Incentive Problems and Investment Timing Options , 2001 .

[17]  Anil Arya,et al.  Abandonment Options and Information System Design , 2003 .

[18]  John C. Fellingham,et al.  Contract-Based Motivation for Keeping Records of a Manager's Reporting and Budgeting History , 1994 .

[19]  W. MacLeod,et al.  On Optimal Contracting with Subjective Evaluation , 2001 .

[20]  Lawrence H. Summers,et al.  A CEO Survey of U.S. Companies' Time Horizons and Hurdle Rates , 1995 .

[21]  Barry M. Staw,et al.  Knee-deep in the Big Muddy: A study of escalating commitment to a chosen course of action. , 1976 .

[22]  John Dickhaut,et al.  Escalation Errors and the Sunk Cost Effect: An Explanation Based on Reputation and Information Asymmetries , 1989 .

[23]  Stefan Reichelstein,et al.  Objective versus Subjective Indicators of Managerial Performance , 2009 .

[24]  Antonio E. Bernardo,et al.  Motivating Entrepreneurial Activity in a Firm , 2005 .

[25]  C. Driver,et al.  Why Do Hurdle Rates Differ from the Cost of Capital , 2010 .