Single machine batch scheduling with resource dependent setup and processing times
暂无分享,去创建一个
[1] Zhi-Long Chen,et al. Single machine scheduling with discretely controllable processing times , 1997, Oper. Res. Lett..
[2] Hamilton Emmons,et al. Scheduling families of jobs with setup times , 1997 .
[3] T.C.E. Cheng,et al. Resource optimal control in some single-machine scheduling problems , 1994, IEEE Trans. Autom. Control..
[4] 勝人 人見,et al. 生産のスケジューリングに関する研究 : 単一工程におけるグループ・スケジューリングの最適化解析 , 1973 .
[5] Adam Janiak,et al. Time-optimal control in a single machine problem with resource constraints , 1986, Autom..
[6] V. A. Petrov. Flowline group production planning , 1968 .
[7] Dirk Biskup,et al. Common due date assignment for scheduling on a single machine with jointly reducible processing times , 2001 .
[8] Zhaohui Liu,et al. Minimizing the Number of Late Jobs under the Group Technology Assumption , 1999, J. Comb. Optim..
[9] Klaus H. Ecker,et al. Scheduling Computer and Manufacturing Processes , 2001 .
[10] Chung-Lun Li,et al. Scheduling to minimize release-time resource consumption and tardiness penalties , 1995 .
[11] T. C. Edwin Cheng,et al. Bicriterion Single Machine Scheduling with Resource Dependent Processing Times , 1998, SIAM J. Optim..
[12] Kenneth R. Baker,et al. Scheduling Groups of Jobs on a Single Machine , 1995, Oper. Res..
[13] Adam Janiak,et al. Single machine scheduling subject to deadlines and resource dependent processing times , 1996 .
[14] George C. Hadjinicola,et al. Cellular Manufacturing at Champion Irrigation Products , 1993 .
[15] Adam Janiak,et al. Single machine group scheduling with ordered criteria , 1995, Ann. Oper. Res..
[16] Adam Janiak,et al. Single machine scheduling problem with a common deadline and resource dependent release dates , 1991 .
[17] Nancy Lea Hyer,et al. Cellular manufacturing in the U.S. industry: a survey of users , 1989 .
[18] E.L. Lawler,et al. Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey , 1977 .
[19] T.C.E. Cheng,et al. Due-date assignment and single machine scheduling with compressible processing times , 1996 .
[20] T. C. Edwin Cheng,et al. Single machine batch scheduling with deadlines and resource dependent processing times , 1995, Oper. Res. Lett..
[21] Adam Janiak,et al. Sequencing with Ordered Criteria, Precedence and Group Technology Constraints , 2001, Informatica.
[22] Alfred V. Aho,et al. The Design and Analysis of Computer Algorithms , 1974 .
[23] Dorit S. Hochbaum,et al. Scheduling with batching: minimizing the weighted number of tardy jobs , 1994, Oper. Res. Lett..
[24] George B. Dantzig,et al. Linear programming and extensions , 1965 .
[25] Apm Wagelmans,et al. Using geometric techniques to improve dynamic programming algorithms for the economic lot-sizing problem and extensions , 1994 .
[26] Mohan V. Tatikonda,et al. Adoption and implementation of group technology classification and coding systems : insights from seven case studies , 1992 .
[27] Angappa Gunasekaran,et al. Experiences of a small to medium size enterprise in the design and implementation of manufacturing cells , 2001, Int. J. Comput. Integr. Manuf..
[28] Chris N. Potts,et al. Scheduling with batching: A review , 2000, Eur. J. Oper. Res..
[29] Chris N. Potts,et al. Integrating Scheduling with Batching and Lot-Sizing: A Review of Algorithms and Complexity , 1992 .
[30] Chung-Lun Li,et al. Scheduling to minimize the total compression and late costs , 1998 .
[31] David Shallcross,et al. A polynomial algorithm for a one machine batching problem , 1992, Oper. Res. Lett..