Factors influencing design development time of commercial properties in Singapore

The fundamental principles of project management governing time, cost and quality should be closely adhered to right from the conceptual design stage in property development to ensure minimal design changes that can have subsequent implications on the overall development of a project. The prognosis of a not so well‐thought out design can be costly once tenders are confirmed. This paper aims to identify the differences in the role perceptions between the client’s project managers and the consultant architects and to determine the major factors that will have a significant influence on the design development time of commercial properties. The study involves a questionnaire survey to determine these factors. The survey findings focus on the size of the design team and client’s in‐house team, communications and decision making in relation to the design development time of completed commercial projects.

[1]  I. Janis Victims Of Groupthink , 1972 .

[2]  Allen C. Amason Distinguishing the Effects of Functional and Dysfunctional Conflict on Strategic Decision Making: Resolving a Paradox for Top Management Teams , 1996 .

[3]  Kim B. Clark,et al.  The Uneasy alliance: Managing the productivity-technology dilemma , 1985 .

[4]  Paul C. Nutt The identification of solution ideas during organizational decision making , 1993 .

[5]  Paul Laseau,et al.  Graphic thinking for architects and designers , 1980 .

[6]  D. H. Sonnenwald Communication in design : a research project , 1992 .

[7]  Joseph H. Boyett,et al.  Workplace 2000 : the revolution reshaping American business , 1991 .

[8]  David G. Mathiasen Groups that work (and those that Don't): Creating Conditions for Effective Teamwork, edited by J. Richard Hackman. San Francisco, CA: Jossey-Bass 1990, 512 pp. Price: $39.95 cloth , 1991 .

[9]  Karen A. Jehn,et al.  Do friends perform better than acquaintances? the interaction of friendship, conflict, and task , 1993 .

[10]  Kim B. Clark,et al.  Product Development in the World Auto Industry , 1987 .

[11]  Robert G. Cooper,et al.  A process model for industrial new product development , 1983, IEEE Transactions on Engineering Management.

[12]  Lee Roy Beach,et al.  The Effects of Time Constraints on the Prechoice Screening of Decision Options , 1996 .

[13]  Gwen M. Wittenbaum,et al.  Management of information in small groups. , 1996 .

[14]  G. Stasser,et al.  Pooling of Unshared Information in Group Decision Making: Biased Information Sampling During Discussion , 1985 .