The proactive and reactive resource-constrained project scheduling problem

Uncertainty has become an inevitable aspect of project scheduling. We study the resource-constrained project scheduling problem with stochastic durations. One of the most studied approaches to deal with stochastic durations is that of proactive and reactive scheduling. Previous researches often studied proactive and reactive scheduling rather separately and ignored the fact that proactive scheduling and reactive scheduling are closely connected. In this paper, we address this ignored aspect by formulating an integrated proactive and reactive scheduling problem with a combined cost function which includes a baseline schedule cost as well as costs of a series of reactions. We introduce solutions to this integrated problem as proactive-and-reactive policies (PR-policies). We discuss that PR-policies are more powerful and informative than their traditional counterparts (i.e., a combination of a baseline schedule and a reactive policy), provide better stability and robustness, and are more flexible when extra constraints are added to the problem. We also propose four dynamic programming based models (Models 1–4) that solve the problem to optimality over different classes of PR-policies. We compare our models with each other and with a combination of a traditional proactive approach (namely, the starting time criticality heuristic) and a reactive approach (namely, the robust parallel schedule generation scheme). Computational results show that Model 2 outperforms the traditional solution only when reaction costs are greater than zero. Moreover, Model 3 and Model 4 clearly outperform Model 1 and Model 2 in all settings and the traditional solution in most of the settings.

[1]  Rainer Kolisch,et al.  PSPLIB - A project scheduling problem library: OR Software - ORSEP Operations Research Software Exchange Program , 1997 .

[2]  Willy Herroelen,et al.  The complexity of machine scheduling for stability with a single disrupted job , 2005, Oper. Res. Lett..

[3]  Rolf H. Möhring,et al.  Robust and Online Large-Scale Optimization: Models and Techniques for Transportation Systems , 2009, Robust and Online Large-Scale Optimization.

[4]  Mohamed Haouari,et al.  A bi-objective model for robust resource-constrained project scheduling , 2005 .

[5]  Erik Demeulemeester,et al.  A branch-and-bound procedure for the multiple resource-constrained project scheduling problem , 1992 .

[6]  Erik Demeulemeester,et al.  A classification of predictive-reactive project scheduling procedures , 2007, J. Sched..

[7]  Frederik Stork,et al.  Stochastic resource-constrained project scheduling , 2001 .

[8]  Marc Lambrecht,et al.  Scheduling Markovian PERT networks to maximize the net present value , 2010, Oper. Res. Lett..

[9]  Cécile Murat,et al.  Recent advances in robust optimization: An overview , 2014, Eur. J. Oper. Res..

[10]  Erik Demeulemeester,et al.  A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations , 2014, Journal of Scheduling.

[11]  Gideon Weiss,et al.  Stochastic scheduling problems II-set strategies- , 1985, Z. Oper. Research.

[12]  Rainer Kolisch,et al.  PSPLIB - a project scheduling problem library , 1996 .

[13]  Erik Demeulemeester,et al.  Proactive policies for the stochastic resource-constrained project scheduling problem , 2011, Eur. J. Oper. Res..

[14]  Erik Demeulemeester,et al.  Heuristic Procedures for Reactive Project Scheduling , 2006, Comput. Ind. Eng..

[15]  Willy Herroelen,et al.  The construction of stable project baseline schedules , 2004, Eur. J. Oper. Res..

[16]  R. Leus,et al.  The trade-off between stability and makespan in resource-constrained project scheduling , 2004 .

[17]  Franz Josef Radermacher,et al.  Preselective strategies for the optimization of stochastic project networks under resource constraints , 1983, Networks.

[18]  Damien Trentesaux,et al.  Scheduling under uncertainty: Survey and research directions , 2014, 2014 International Conference on Advanced Logistics and Transport (ICALT).

[19]  Willy Herroelen,et al.  Project Scheduling—Theory and Practice , 2005 .

[20]  Alexander Shapiro,et al.  A dynamic programming approach to adjustable robust optimization , 2011, Oper. Res. Lett..

[21]  Erik Demeulemeester,et al.  Proactive heuristic procedures for robust project scheduling: An experimental analysis , 2008, Eur. J. Oper. Res..

[22]  Roel Leus,et al.  Resource‐Constrained Project Scheduling for Timely Project Completion with Stochastic Activity Durations , 2007 .

[23]  A. Ben-Tal,et al.  Adjustable robust solutions of uncertain linear programs , 2004, Math. Program..

[24]  Stefan Creemers,et al.  Minimizing the expected makespan of a project with stochastic activity durations under resource constraints , 2015, J. Sched..

[25]  Gideon Weiss,et al.  Stochastic scheduling problems I — General strategies , 1984, Z. Oper. Research.

[26]  Rolf H. Möhring,et al.  The Concept of Recoverable Robustness, Linear Programming Recovery, and Railway Applications , 2009, Robust and Online Large-Scale Optimization.

[27]  Erik Demeulemeester,et al.  New Benchmark Results for the Resource-Constrained Project Scheduling Problem , 1997 .

[28]  Can Akkan,et al.  Finding robust timetables for project presentations of student teams , 2016, Eur. J. Oper. Res..

[29]  Erik Demeulemeester,et al.  The use of buffers in project management: The trade-off between stability and makespan , 2004 .

[30]  Jingwen Zhang,et al.  A bi-objective model for robust resource-constrained project scheduling problem with random activity durations , 2015, 2015 IEEE 12th International Conference on Networking, Sensing and Control.

[31]  S. Asmervik,et al.  Megaprojects and Risk. An Anatomy of Ambition , 2004 .

[32]  Jan Van Damme,et al.  Project scheduling under uncertainty survey and research potentials , 2002 .

[33]  Erik Demeulemeester,et al.  Robust Project Scheduling , 2011, Found. Trends Technol. Inf. Oper. Manag..

[34]  Mohamed Haouari,et al.  A two-stage-priority-rule-based algorithm for robust resource-constrained project scheduling , 2008, Comput. Ind. Eng..

[35]  Ramón Alvarez-Valdés Olaguíbel,et al.  The project scheduling polyhedron: Dimension, facets and lifting theorems , 1993 .

[36]  Roel Leus,et al.  The generation of stable project plans , 2004, 4OR.

[37]  Shahram Shadrokh,et al.  Bi-objective resource-constrained project scheduling with robustness and makespan criteria , 2006, Appl. Math. Comput..

[38]  Roel Leus,et al.  New competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processing , 2011, J. Sched..