Management of production in construction: A theoretical view
暂无分享,去创建一个
[1] Boaz Ronen. The complete kit concept , 1992 .
[2] John C. Wortmann,et al. Factory of the Furture: Towards an Integrated Theory for One-of-a-Kind Production , 1991, One-Of-A-Kind Production.
[3] Michael R. Finke. A Better Way to Estimate and Mitigate Disruption , 1998 .
[4] George S. Birrell. Construction Planning—Beyond the Critical Path , 1980 .
[5] Asbjørn Rolstadås. Planning and control of concurrent engineering projects , 1995 .
[6] Richard L. Tucker,et al. Is construction project planning really doing its job? A critical examination of focus, role and process , 1987 .
[7] Glenn Ballard. CAN PULL TECHNIQUES BE USED IN DESIGN MANAGEMENT , 1999 .
[8] Lauri Koskela,et al. Roles of supply chain management in construction , 1999 .
[9] Wallace J. Hopp,et al. Factory physics : foundations of manufacturing management , 1996 .
[10] Lauri Koskela,et al. Rakennushankkeen toteutuksen tehostaminen. Mahdollisuudet ja keinot hankkeen eri vaiheissa , 1999 .
[11] J. Little. A Proof for the Queuing Formula: L = λW , 1961 .
[12] Andrew Kusiak,et al. Manufacturing control with a push-pull approach , 1998 .
[13] Léon Walras. Éléments d'économie politique pure, ou, Théorie de la richesse sociale , 1976 .
[14] Gregory A. Howell,et al. SHIELDING PRODUCTION: ESSENTIAL STEP IN PRODUCTION CONTROL , 1998 .
[15] Shang Zhi,et al. A proof of the queueing formula: L=λW , 2001 .