Conversion from IFPUG FPA to COSMIC: Within-vs Without-Company Equations
暂无分享,去创建一个
[1] Guilherme Horta Travassos,et al. Cross versus Within-Company Cost Estimation Studies: A Systematic Review , 2007, IEEE Transactions on Software Engineering.
[2] Filomena Ferrucci,et al. A Case Study Using Web Objects and COSMIC for Effort Estimation of Web Applications , 2008, 2008 34th Euromicro Conference Software Engineering and Advanced Applications.
[3] J. Brian Gray,et al. Introduction to Linear Regression Analysis , 2002, Technometrics.
[4] Robert L. Glass,et al. Persistent Software Errors , 1981, IEEE Transactions on Software Engineering.
[5] C. Symons,et al. The COSMIC Functional Size Measurement Method : Measurement Manual : The COSMIC Implementation Guide for ISO/IEC 19761:2011 , 2015 .
[6] Onur Demirörs,et al. Functional size measurement revisited , 2008, TSEM.
[7] R. F.,et al. Mathematical Statistics , 1944, Nature.
[8] Sandro Morasca,et al. Convertibility of Function Points into COSMIC Function Points: A study using Piecewise Linear Regression , 2011, Inf. Softw. Technol..
[9] Stephen G. MacDonell,et al. What accuracy statistics really measure , 2001, IEE Proc. Softw..
[10] J. Royston. An Extension of Shapiro and Wilk's W Test for Normality to Large Samples , 1982 .
[11] Katrina D. Maxwell,et al. Applied Statistics for Software Managers , 2002 .
[12] Alain Abran,et al. Measurement convertibility : from function points to COSMIC-FFP , 2005 .
[13] David J. Groggel,et al. Practical Nonparametric Statistics , 2000, Technometrics.
[14] Emilia Mendes,et al. A Comparative Study of Cost Estimation Models for Web Hypermedia Applications , 2003, Empirical Software Engineering.
[15] Robert L. Glass,et al. Facts and fallacies of software engineering , 2002 .
[16] Frank Vogelezang. Applicability of COSMIC Full Function Points in an administrative environment Experiences of an early adopter , 2003 .
[17] Graham J Hole,et al. How to Design and Report Experiments , 2002 .
[18] B. Kitchenham,et al. Case Studies for Method and Tool Evaluation , 1995, IEEE Softw..
[19] A. Abran,et al. The COSMIC Functional Size Measurement Method version 3.0, Measurement Manual , 2007 .
[20] T. Breurch,et al. A simple test for heteroscedasticity and random coefficient variation (econometrica vol 47 , 1979 .
[21] Klaas Sikkel,et al. Generalizing by similarity: Lessons learnt from industrial case studies , 2013, 2013 1st International Workshop on Conducting Empirical Studies in Industry (CESI).
[22] Onur Demirörs,et al. An experimental study on the conversion between IFPUG and COSMIC functional size measurement units , 2010, Inf. Softw. Technol..
[23] Alain Abran,et al. Convertibility of function points to COSMIC-FPP: identification and analysis fo functional outliers , 2006 .
[24] Filomena Ferrucci,et al. A Case Study on the Conversion of Function Points into COSMIC , 2011, 2011 37th EUROMICRO Conference on Software Engineering and Advanced Applications.
[25] Thomas Fetcke,et al. The Warehouse Software Portfolio A Case Study in Functional Size Measurement , 1999 .
[26] Tore Dybå,et al. A systematic review of effect size in software engineering experiments , 2007, Inf. Softw. Technol..
[27] Emilia Mendes,et al. Cross- vs. within-company cost estimation studies revisited: an extended systematic review , 2014, EASE '14.
[28] Cem Kaner,et al. Software Engineering Metrics: What Do They Measure and How Do We Know? , 2004 .