Time-to-market vs. time-to-delivery: Managing speed in Engineering, Procurement and Construction projects

The time-to-market in NPD projects is a key factor in the competition between innovative firms. Research on concurrent engineering has shown that time can be managed as well as a delay and as a speed. Our concern in this paper is to study the time factor in the case of Engineering, Procurement and Construction (EPC) projects, where a customer initially contracts for a project from a contractor on the basis of specifications, budget and delay. Is time-to-delivery a key factor? Does its reduction represent a competitive advantage for the client and/or for the contractor in EPC projects? Is project speed a key variable to be managed, or does it result from other project parameters? We first define an analytical model to characterize a speed profile in EPC projects. We implement this model for six major construction projects developed by a large, international firm. A variety of speed profiles result. We conclude by showing the relevance of NPD project speed management in EPC projects.

[1]  Marie des Neiges Baudry de Vaux,et al.  Christophe Midler, L'auto qui n'existait pas : management des projets et transformation de l'entreprise, Paris, Interéditions, 1996 (2e éd.) , 2001 .

[2]  Steven C. Wheelwright,et al.  Revolutionizing New Product Development: Quantum Leaps in Speed, Efficiency, and Quality (Революция в разработке продуктов: количественный скачок в скорости, эффективности и качестве) , 1992 .

[3]  T. Hout,et al.  Competing Against Time , 1990 .

[4]  David Greenwood,et al.  An efficient method for scheduling construction projects with resource constraints , 2001 .

[5]  K. Eisenhardt,et al.  Time pacing: competing in markets that won't stand still. , 1998, Harvard business review.

[6]  H. Randolph Thomas,et al.  LEARNING CURVE MODELS OF CONSTRUCTION PRODUCTIVITY , 1986 .

[7]  Mohan M. Kumaraswamy,et al.  Evaluation of factors affecting Time and Cost performance in Hong Kong Building projects , 1999 .

[8]  M. Lambkin Order of entry and performance in new markets , 1988 .

[9]  R. Cordero Managing for speed to avoid product obsolescence: A survey of techniques , 1991 .

[10]  Steven C. Wheelwright,et al.  Revolutionizing Product Development: Quantum Leaps in Speed, Efficiency and Quality , 1992 .

[11]  Massimo Scanziani,et al.  Competing on the edge , 2002, Trends in Neurosciences.

[12]  S. Keoki. Sears,et al.  Construction Project Management , 1972 .

[13]  Sou-Sen Leu,et al.  A GA-based fuzzy optimal model for construction time-cost trade-off , 2001 .

[14]  C. Midler L'auto qui n'existait pas : management des projets et transformation de l'entreprise , 1993 .

[15]  M. Rosenau SPEEDING YOUR NEW PRODUCT TO MARKET , 1988 .

[16]  Bernard Cova,et al.  A twin-track networking approach to project marketing , 1997 .

[17]  John Callahan,et al.  Reducing software product development time , 2001 .