Industrial implementation of a real-time optimization strategy for maximizing production of LPG in a FCC unit
暂无分享,去创建一个
[1] Yash P. Gupta,et al. Control of the Fluidized Catalytic Cracking Process Using a Simplified Model Predictive Controller , 1996 .
[2] Lincoln F. L. Moro,et al. Constrained multivariable control of fluid catalytic cracking converters , 1995 .
[3] A. Arbel,et al. Dynamic and control of fluidized catalytic crackers. 1: Modeling of the current generation of FCC`s , 1995 .
[4] Babu Joseph,et al. Performance and stability analysis of LP‐MPC and QP‐MPC cascade control systems , 1999 .
[5] Armando B. Corripio,et al. On-line optimization of a model IV fluid catalytic cracking unit , 1998 .
[6] Said S.E.H. Elnashaie,et al. Nonlinear Model Predictive Control of Industrial Type IV Fluid Catalytic Cracking (FCC) Units for Maximum Gasoline Yield , 1997 .
[7] Xuan Li,et al. Modeling and Optimization of a Model IV Fluidized Catalytic Cracking Unit , 1998 .
[8] Christos Georgakis,et al. Dynamic simulator for a Model IV fluid catalytic cracking unit , 1993 .