Tool replacement policies for a machining centre producing multiple types of products with distinct due dates
暂无分享,去创建一个
[1] Christos Koulamas,et al. Simultaneous determination of optimal machining conditions and tool replacement policies in constrained machining economics problems by geometric programming , 1991 .
[2] Richard A. Wysk,et al. Optimal cutting tool replacement based on tool wear status , 1990 .
[3] S. Noto La Diega,et al. Optimum tool replacement policies with penalty cost for unforeseen tool failure , 1983 .
[4] Robert U. Ayres. Future Trends in Factory Automation , 1987 .
[5] Chris N. Potts,et al. A decomposition algorithm for the single machine total tardiness problem , 1982, Oper. Res. Lett..
[6] Ming Liang,et al. Solving the combined part sequencing and tool replacement problem for an automated machining center: a tabu search approach , 1995 .
[7] A. K. Sheikh. Optimal tool replacement and resetting strategies in automated manufacturing systems , 1999 .
[8] N. H. Cook,et al. Tool Wear and Tool Life , 1973 .
[9] Moshe M. Barash,et al. Cutting-tool management in computer-integrated manufacturing , 1992 .
[10] Roberto Tadei,et al. A new decomposition approach for the single machine total tardiness scheduling problem , 1998, J. Oper. Res. Soc..
[11] Kathryn E. Stecke,et al. A synthesis of decision models for tool management in automated manufacturing , 1993 .
[12] Joseph Sharit,et al. Computerization of tool-replacement decision making in flexible manufacturing systems: a human-systems perspective , 1989 .
[13] L. A. Kendall,et al. A replacement model for multi tool transfer lines , 1990 .