Transition zones to railway bridges: Track measurements and numerical modelling
暂无分享,去创建一个
[1] Andreas Lundqvist,et al. Railway track stiffness variation - consequences and countermeasures , 2010 .
[2] Rui Calçada,et al. Design and construction of backfills for railway track transition zones , 2015 .
[3] Jean-Louis Briaud,et al. Preliminary Evaluation of the Bump at the End of the Railway Bridge , 2011 .
[4] Ernest T. Selig,et al. Track Geotechnology and Substructure Management , 1995 .
[5] Raimundo Delgado,et al. Finite-element model calibration of a railway vehicle based on experimental modal parameters , 2013 .
[6] I. Lee,et al. UNIFIED BOUNDARY FOR FINITE DYNAMIC MODELS , 1976 .
[7] Andreas Lundqvist,et al. Load impact on railway track due to unsupported sleepers , 2005 .
[8] S. Fontul,et al. Improving the Use of Unbound Granular Materials in Railway Sub-ballast Layer , 2012 .
[9] Andrés López-Pita,et al. Deterioration in geometric track quality on high speed lines: the experience of the Madrid-Seville high speed line (1992-2002) , 2006 .
[10] Justin Kennedy,et al. Behaviour of train–track interaction in stiffness transitions , 2012 .
[11] Ana Cristina Carvalhinho Alves Ribeiro. Transições aterro-estrutura em linhas ferroviárias de alta velocidade : análise experimental e numérica , 2012 .
[12] Luis Uralde. La auscultación y los trabajos de vía en la línea del ave Madrid - Sevilla: análisis de la experiencia y deducción de nuevos criterios de mantenimiento , 2005 .
[13] Rui Calçada,et al. On the use of under sleeper pads in transition zones at railway underpasses: experimental field testing , 2015 .
[14] Rui Calçada,et al. Under sleeper pads in transition zones at railway underpasses: numerical modelling and experimental validation , 2015 .
[15] Joaquim Gabriel,et al. Dynamic monitoring of railway track displacement using an optical system , 2015 .