Interval-Parameter Conditional Value-at-Risk Two-Stage Stochastic Programming Model for Management of End-of-Life Vehicles

The management of end-of-life vehicles conserves natural resources, provides economic benefits, and reduces water, air, and soil pollution. Sound management of end-of-life vehicles is vitally important worldwide thus requiring sophisticated decision-making tools for optimizing its efficiency and reducing system risk. This paper proposes an interval-parameter conditional value-at-risk two-stage stochastic programming model for management of end-of-life vehicles. A case study is conducted in order to demonstrate the usefulness of the developed model. The model is able to provide the trade-offs between the expected profit and system risk. It can effectively control risk at extremely disadvantageous availability levels of end-of-life vehicles. The formulated model can produce optimal solutions under predetermined decision-making risk preferences and confidence levels. It can simultaneously determine the optimal long-term allocation targets of end-of-life vehicles and reusable parts as well as capital investment, production planning, and logistics management decisions within a multi-period planning horizon. The proposed model can efficiently handle uncertainties expressed as interval values and probability distributions. It is able to provide valuable insights into the effects of uncertainties. Compared to the available models, the resulting solutions are far more robust.

[1]  Sezin Balcia,et al.  A Mixed Integer Linear Programming Model for End of Life Vehicles Recycling Network Design , 2017 .

[2]  Noha M. Galal,et al.  Design of Sustainable End-of-life Vehicle recovery network in Egypt , 2011 .

[3]  Branka Dimitrijevic,et al.  Modelling production processes in a vehicle recycling plant , 2012, Waste management & research : the journal of the International Solid Wastes and Public Cleansing Association, ISWA.

[4]  Randolph Kirchain,et al.  How Much Sorting Is Enough , 2011 .

[5]  Danijela Tadic,et al.  Network Design for the Dismantling Centers of the End-of-Life Vehicles Under Uncertainties: A Case Study , 2011 .

[6]  Eren Özceylan,et al.  A closed-loop supply chain network design for automotive industry in Turkey , 2017, Comput. Ind. Eng..

[7]  Md. Rezaul Hasan Shumon,et al.  A comparative decision-making model for sustainable end-of-life vehicle management alternative selection using AHP and extent analysis method on fuzzy AHP , 2016 .

[8]  Tao Wang,et al.  Policies on end-of-life passenger cars in China: dynamic modeling and cost-benefit analysis , 2015 .

[9]  Xiaosheng Qin,et al.  A Conditional Value-at-Risk Based Inexact Water Allocation Model , 2011 .

[10]  Birger Raa,et al.  Influence of composition, amount and life span of passenger cars on end-of-life vehicles waste in Belgium: A system dynamics approach , 2016 .

[11]  Wei Sun,et al.  Risk management for sulfur dioxide abatement under multiple uncertainties , 2016, Frontiers of Earth Science.

[12]  R. Mayorga,et al.  A Combined Fuzzy Approach to Determine Sustainable ELV Strategy , 2016 .

[13]  Y. P. Li,et al.  An optimization decision support approach for risk analysis of carbon emission trading in electric power systems , 2015, Environ. Model. Softw..

[14]  Bronisław Gołębiewski,et al.  Modelling of the location of vehicle recycling facilities: A case study in Poland , 2013 .

[15]  G. Pflug Some Remarks on the Value-at-Risk and the Conditional Value-at-Risk , 2000 .

[16]  Saeed Mansour,et al.  To develop a third-party reverse logistics network for end-of-life vehicles in Iran , 2013 .

[17]  Nursel Öztürk,et al.  Network modeling for reverse flows of end-of-life vehicles. , 2015, Waste management.

[18]  Vladimir Simic,et al.  Interval-parameter chance-constraint programming model for end-of-life vehicles management under rigorous environmental regulations. , 2016, Waste management.

[19]  K. Williams,et al.  Challenges around automotive shredder residue production and disposal. , 2017, Waste management.

[20]  Ming Chen,et al.  Assessing the economics of processing end-of-life vehicles through manual dismantling. , 2016, Waste management.

[21]  Elif Akçali,et al.  Pricing and recovery planning for demanufacturing operations with multiple used products and multiple reusable components , 2010, Comput. Ind. Eng..

[22]  Kannan Govindan,et al.  Reverse logistics network design and planning utilizing conditional value at risk , 2014, Eur. J. Oper. Res..

[23]  Agnieszka Merkisz-Guranowska MULTICRITERIA OPTIMIZATION MODEL FOR END-OF-LIFE VEHICLES' RECYCLING NETWORK , 2013 .

[24]  Shamsuddin Ahmed,et al.  Prioritizing Strategies for Sustainable End-of-Life Vehicle Management Using Combinatorial Multi-Criteria Decision Making Method , 2016, Int. J. Fuzzy Syst..

[25]  R. Rockafellar,et al.  Optimization of conditional value-at risk , 2000 .

[26]  M. Mehrjoo Supply Chain Risk Assessment for Perishable Products Applying System Dynamics Methodology - A Case of Fast Fashion Apparel Industry , 2014 .

[27]  Yongping Li,et al.  An inexact risk management model for agricultural land-use planning under water shortage , 2015, Frontiers of Earth Science.

[28]  B. Sandén,et al.  Are scarce metals in cars functionally recycled? , 2017, Waste management.

[29]  Naoki Shibahara,et al.  Comparative assessment on greenhouse gas emissions of end-of-life vehicles recycling methods , 2017 .

[30]  Milorad Vidovic,et al.  A novel covering approach to positioning ELV collection points , 2011 .

[31]  B. Sandén,et al.  Lessons from a century of innovating car recycling value chains , 2017 .

[32]  Zongguo Wen,et al.  Monetary evaluation of end-of-life vehicle treatment from a social perspective for different scenarios in China , 2017 .

[33]  Phil Howlett,et al.  The Mekong—applications of value at risk (VaR) and conditional value at risk (CVaR) simulation to the benefits, costs and consequences of water resources development in a large river basin , 2007 .

[34]  Yandong He,et al.  ELV Recycling Service Provider Selection Using the Hybrid MCDM Method: A Case Application in China , 2016 .

[35]  Daqiang Chen,et al.  Study on Green Supply Chain Coordination in ELV Recycling System with Government Subsidy for the Third-Party Recycler , 2016 .

[36]  Guohe Huang,et al.  An interval-parameter mean-CVaR two-stage stochastic programming approach for waste management under uncertainty , 2014, Stochastic Environmental Research and Risk Assessment.

[37]  Agnieszka Merkisz-Guranowska End-of-life vehicles recycling network design , 2011 .

[38]  Qianwang Deng,et al.  Optimal Acquisition and Production Policy for End-of-Life Engineering Machinery Recovering in a Joint Manufacturing/Remanufacturing System under Uncertainties in Procurement and Demand , 2017 .

[39]  Nilay Noyan,et al.  Risk-averse two-stage stochastic programming with an application to disaster management , 2012, Comput. Oper. Res..

[40]  B. Yu,et al.  Optimization of a regional distribution center location for parts of end-of-life vehicles , 2018, Simul..

[41]  Rémy Gourdon,et al.  Multi-Criteria Evaluation of End-of-Life Vehicles’ Dismantling Scenarios with Respect to Technical Performance and Sustainability Issues , 2016 .

[42]  Yu-Chung Tsao,et al.  Optimizing fuzzy reverse supply chain for end-of-life vehicles , 2017, Comput. Ind. Eng..

[43]  Zhongfei Li,et al.  Mean-CVaR portfolio selection: A nonparametric estimation framework , 2013, Comput. Oper. Res..

[44]  Guohe Huang,et al.  An optimization model for water resources allocation risk analysis under uncertainty , 2014 .

[45]  Bernard Yannou,et al.  A cost and benefit analysis of future end-of-life vehicle glazing recycling in France: A systematic approach , 2013 .

[46]  Vladimir Simic,et al.  A multi-stage interval-stochastic programming model for planning end-of-life vehicles allocation , 2016 .

[47]  V. Simić A two-stage interval-stochastic programming model for planning end-of-life vehicles allocation under uncertainty , 2015 .

[48]  I. G. Moghaddam,et al.  Risk-averse profit-based optimal operation strategy of a combined wind farm–cascade hydro system in an electricity market , 2013 .

[49]  Matthew Franchetti,et al.  An Integrated Approach to Vehicle Recycling Facilities , 2016 .

[50]  Philippe Artzner,et al.  Coherent Measures of Risk , 1999 .

[51]  Duncan C. McFarlane,et al.  Quantifying the impact of AIDC technologies for vehicle component recovery , 2010, Comput. Ind. Eng..

[52]  Branka Dimitrijevic,et al.  Interval linear programming model for long-term planning of vehicle recycling in the Republic of Serbia under uncertainty , 2015, Waste management & research : the journal of the International Solid Wastes and Public Cleansing Association, ISWA.

[53]  Stan Uryasev,et al.  Conditional Value-at-Risk: Optimization Approach , 2001 .

[54]  H. Edwin Romeijn,et al.  Comparison of new conditional value‐at‐risk‐based management models for optimal allocation of uncertain water supplies , 2007 .

[55]  Ali Husseinzadeh Kashan,et al.  Designing a Reverse Logistics Network for End-of-Life Vehicles Recovery , 2010 .

[56]  Silvia Fiore,et al.  Strategies for the enhancement of automobile shredder residues (ASRs) recycling: results and cost assessment. , 2014, Waste management.

[57]  Yuichi Moriguchi,et al.  Variability-based optimal design for robust plastic recycling systems , 2017 .

[58]  Stan Uryasev,et al.  Conditional value-at-risk: optimization algorithms and applications , 2000, Proceedings of the IEEE/IAFE/INFORMS 2000 Conference on Computational Intelligence for Financial Engineering (CIFEr) (Cat. No.00TH8520).

[59]  Guangdong Tian,et al.  The construction and cost-benefit analysis of end-of-life vehicle disassembly plant: a typical case in China , 2016, Clean Technologies and Environmental Policy.

[60]  R. Rockafellar,et al.  Conditional Value-at-Risk for General Loss Distributions , 2001 .

[61]  G H Huang,et al.  An inexact mixed risk-aversion two-stage stochastic programming model for water resources management under uncertainty , 2014, Environmental Science and Pollution Research.

[62]  Guohe Huang,et al.  CVaR-based factorial stochastic optimization of water resources systems with correlated uncertainties , 2016, Stochastic Environmental Research and Risk Assessment.

[63]  Branka Dimitrijevic,et al.  Production planning for vehicle recycling factories in the EU legislative and global business environments , 2012 .

[64]  Helmut Mausser,et al.  Credit risk optimization with Conditional Value-at-Risk criterion , 2001, Math. Program..

[65]  Maria C. Carneiro,et al.  Risk Management in the Oil Supply Chain: A CVaR Approach , 2010 .

[66]  Ping Guo,et al.  An inexact CVaR two-stage mixed-integer linear programming approach for agricultural water management under uncertainty considering ecological water requirement , 2017, Ecological Indicators.

[67]  S. Effati,et al.  Multiobjective Optimal Control of HIV Dynamics , 2010 .

[68]  Govindan Kannan,et al.  Incorporating risk measures in closed-loop supply chain network design , 2014 .

[69]  Wai Ming Cheung,et al.  Cost evaluation in design for end-of-Life of automotive components , 2017 .

[70]  Zi Qiang Zhou,et al.  Research of Value Analysis Oriented End of Life Vehicle Dismantling and Recycling Process , 2012 .

[71]  Duncan McFarlane,et al.  Value of information in product recovery decisions: a Bayesian approach , 2010 .

[72]  Y. F. Li,et al.  An inexact two-stage stochastic programming model for water resources management in Nansihu Lake Basin, China. , 2013, Journal of environmental management.

[73]  Ming Chen,et al.  Prioritising alternatives for sustainable end-of-life vehicle disassembly in China using AHP methodology , 2018, Technol. Anal. Strateg. Manag..

[74]  Mauro Gamberi,et al.  A planning model for the optimisation of the end-of-life vehicles recovery network , 2014 .

[75]  Guohe Huang,et al.  Development of an inexact risk-aversion optimization model for regional carbon constrained electricity system planning under uncertainty , 2015 .

[76]  Fengqi You,et al.  Design under uncertainty of hydrocarbon biorefinery supply chains: Multiobjective stochastic programming models, decomposition algorithm, and a Comparison between CVaR and downside risk , 2012 .

[77]  Wlodzimierz Ogryczak,et al.  Dual Stochastic Dominance and Related Mean-Risk Models , 2002, SIAM J. Optim..

[78]  Branka Dimitrijevic,et al.  Modelling of automobile shredder residue recycling in the Japanese legislative context , 2013, Expert Syst. Appl..

[80]  Ching-Pin Tung,et al.  Interval number fuzzy linear programming for climate change impact assessments of reservoir active storage , 2009, Paddy and Water Environment.

[81]  E. Tam,et al.  Plastics Waste Processing: Comminution Size Distribution and Prediction , 2007 .

[82]  Rüdiger Schultz,et al.  Conditional Value-at-Risk in Stochastic Programs with Mixed-Integer Recourse , 2006, Math. Program..

[83]  Neslihan Demirel,et al.  A mixed integer linear programming model to optimize reverse logistics activities of end-of-life vehicles in Turkey , 2016 .

[84]  Jun-ya Gotoh,et al.  Newsvendor solutions via conditional value-at-risk minimization , 2007, Eur. J. Oper. Res..

[85]  N. Menad,et al.  Cryogenic ball milling: A key for elemental analysis of plastic-rich automotive shedder residue , 2016 .

[86]  Tong Shaocheng,et al.  Interval number and fuzzy number linear programmings , 1994 .

[87]  Ali Osman Kusakci,et al.  A Literature Survey on Reverse Logistics of End of Life Vehicles , 2017 .

[88]  John W. Chinneck,et al.  Linear programming with interval coefficients , 2000, J. Oper. Res. Soc..