Analysis of a standby system with dependent repair time and slow switching device
暂无分享,去创建一个
L. R. Goel | Rakesh Gupta | P. K. Tyagi | Rakesh Gupta | L. Goel | P. Tyagi
[1] Rakesh Gupta,et al. Cost-benefit analysis of a multi-component standby system with inspection and slow switch , 1986 .
[2] L. R. Goel,et al. Two unit cold standby system with correlated failures and repairs , 1992 .
[3] L. R. Goel,et al. CHE failure in a two-unit standby system with slow switch, repair and post repair , 1991 .
[4] L. R. Goel,et al. Cost analysis of a two unit cold standby system under different weather conditions , 1985 .
[5] L. R. Goel,et al. Profit analysis of a two-unit redundant system with provision for rest and correlated failures and repairs , 1991 .
[6] L. R. Goel,et al. Profit analysis of a two-unit standby system with two types of repair and preventive maintenance , 1986 .