Real-time tsunami inundation forecast system for tsunami disaster prevention and mitigation

The tsunami disasters that occurred in Indonesia, Chile, and Japan have inflicted serious casualties and damaged social infrastructures. Tsunami forecasting systems are thus urgently required worldwide. We have developed a real-time tsunami inundation forecast system that can complete a tsunami inundation and damage forecast for coastal cities at the level of 10-m grid size in less than 20 min. As the tsunami inundation and damage simulation is a vectorizable memory-intensive program, we incorporate NEC’s vector supercomputer SX-ACE. In this paper, we present an overview of our system. In addition, we describe an implementation of the program on SX-ACE and evaluate its performance of SX-ACE in comparison with the cases using an Intel Xeon-based system and the K computer. Then, we clarify that the fulfillment of a real-time tsunami inundation forecast system requires a system with high-performance cores connected to the memory subsystem at a high memory bandwidth such as SX-ACE.

[1]  Yusaku Ohta,et al.  Quasi real‐time fault model estimation for near‐field tsunami forecasting based on RTK‐GPS analysis: Application to the 2011 Tohoku‐Oki earthquake (Mw 9.0) , 2012 .

[2]  D. Wells,et al.  New empirical relationships among magnitude, rupture length, rupture width, rupture area, and surface displacement , 1994, Bulletin of the Seismological Society of America.

[3]  T. Tomita,et al.  Development of High Precision Tsunami Runup Calculation Method Based on a Hierarchical Simulation , 2016 .

[4]  Earthquake and Tsunami Warning System for Natural Disaster Prevention , 2013 .

[5]  Hiroaki Kobayashi,et al.  Performance evaluation of NEC SX-9 using real science and engineering applications , 2009, Proceedings of the Conference on High Performance Computing Networking, Storage and Analysis.

[6]  Noritaka Hoshi,et al.  SX-ACE, the Brand-New Vector Supercomputer for Higher Sustained Performance II , 2015 .

[7]  T. Haraguchi,et al.  Field measurements and numerical modeling for the run-up heights and inundation distances of the 2011 Tohoku-oki tsunami at Sendai Plain, Japan , 2012, Earth, Planets and Space.

[8]  Hiroaki Kobayashi,et al.  Characteristics of an On-Chip Cache on NEC SX Vector Architecture , 2009 .

[9]  Hiroaki Kobayashi,et al.  Effects of MSHR and Prefetch Mechanisms on an On-Chip Cache of the Vector Architecture , 2008, 2008 IEEE International Symposium on Parallel and Distributed Processing with Applications.

[10]  Takayuki Aoki,et al.  Real-Time Tsunami Simulation on Multi-node GPU Cluster , 2009 .

[11]  Taku Urabe,et al.  GRiD MT (grid-based real-time determination of moment tensors) monitoring the long-period seismic wavefield , 2009 .

[12]  Daisuke Sugawara,et al.  Near‐field tsunami inundation forecast using the parallel TUNAMI‐N2 model: Application to the 2011 Tohoku‐Oki earthquake combined with source inversions , 2015 .

[13]  Hajime Mase,et al.  Computationally Efficient Tsunami Modeling on Graphics Processing Units (GPUs) , 2016 .

[14]  Vijay Laxmi,et al.  Parallelizing TUNAMI-N1 Using GPGPU , 2011, 2011 IEEE International Conference on High Performance Computing and Communications.

[15]  Fumihiko Imamura,et al.  Developing Fragility Functions for Tsunami Damage Estimation Using Numerical Model and Post-Tsunami Data from Banda Aceh, Indonesia , 2009 .

[16]  Y. Okada Internal deformation due to shear and tensile faults in a half-space , 1992, Bulletin of the Seismological Society of America.

[17]  Kentaro Sano,et al.  FPGA-based tsunami simulation: Performance comparison with GPUs, and roofline model for scalability analysis , 2017, J. Parallel Distributed Comput..

[18]  Mitsuo Yokokawa The K Computer and its Application , 2012, 2012 Third International Conference on Networking and Computing.