Improving Project Performance through Partnering and Emotional Intelligence

AbstractThe construction industry represents around 5% of the U.S. gross domestic product (GDP). The scores of baby boomers beginning to retire in the engineering and construction industries are taking a lifetime of institutional knowledge with them. This scenario results in a relatively limited supply of experienced personnel. Partnering is one potential solution to overcome this problem. This paper makes the case that advancing the emotional intelligence (EI) of project participants can improve the partnering effort and ultimately result in increased project performance. This improved performance, to some extent, mitigates the effects of the loss of institutional knowledge. This paper introduces a people-based model that holistically illustrates the components and activities necessary to take a construction project from inception to successful completion. The authors also evaluated contractors who have partnered with the Virginia DOT (VDOT) and found that managers of successful projects exhibited high E...

[1]  Duncan J. Watts,et al.  Cooperation in Evolving Social Networks , 2007, Manag. Sci..

[2]  John Messner,et al.  Assessing Traits for Success in Individual and Team Performance in an Engineering Course , 2009 .

[3]  S El-Sabaa,et al.  The skills and career path of an effective project manager , 2001 .

[4]  P. Chinowsky,et al.  Emotional Intelligence and Leadership Behavior in Construction Executives , 2006 .

[5]  Derek H.T. Walker,et al.  Building capability in construction projects: a relationship‐based approach , 2009 .

[6]  Larry G. Crowley,et al.  Conceptual Model of Partnering , 1995 .

[7]  Awad S. Hanna,et al.  Quantifying Performance for the Integrated Project Delivery System as Compared to Established Delivery Systems , 2013 .

[8]  Douglas D. Gransberg,et al.  QUANTITATIVE ANALYSIS OF PARTNERED PROJECT PERFORMANCE , 1999 .

[9]  Eddy M. Rojas,et al.  Evolution of Collaboration in Temporary Project Teams: An Agent-Based Modeling and Simulation Approach , 2011 .

[10]  Jack R. Meredith,et al.  Project Management: A Managerial Approach , 1989 .

[11]  Hemanta Doloi,et al.  Empirical Analysis of Traditional Contracting and Relationship Agreements for Procuring Partners in Construction Projects , 2013 .

[12]  Mark Konchar,et al.  Comparison of U.S. Project Delivery Systems , 1998 .

[13]  Charles Fleetham,et al.  Leveraging Personality for Business Success , 2006 .

[14]  L. L. Cummings,et al.  Managerial Process and Organizational Behavior. , 1970 .

[15]  Steve R. Sanders,et al.  PARTNERING PROCESS MODEL , 1997 .

[16]  H. Brown Emotional Intelligence: Thinking out of the Box , 2003 .

[17]  Michael S. Puddicombe,et al.  Designers and contractors: Impediments to integration , 1997 .

[18]  Nm Bouchlaghem,et al.  Collaborative working and its effects on the AEC organisation , 2005 .

[19]  Anthony M. Armocida The Seven Habits of Highly Effective People , 1992 .

[20]  Erik Larson,et al.  Project Partnering: Results of Study of 280 Construction Projects , 1995 .