Dynamic construction material layout planning optimization model by integrating 4D BIM

Construction material layout planning is a key project in temporary facility layouts. When allocating materials without effective resource consolidation and planning in advance, construction managers usually have difficulties in comprehensively determining resource demand to optimize material layout. This also leads to reduced efficiency, increased cost, and unnecessary loss of time. This study proposed the dynamic construction material layout planning optimization model to investigate the optimization of material layout from the perspective of dynamic task scheduling. In addition to the variables of schedule advancement and evolution, dynamic material requirements, and changes in storage sites and areas, task float times were analyzed to account for the changes in three-dimensional travel distances between material supply and demand sites concurrently with changes in task schedules and ensure that the observations conformed to real-time conditions. First, schedule and building information modeling techniques as well as the procedures for quantity take-off and construction materials and quantity analysis were consolidated to produce dynamic material requirements data for construction layout planning. Second, the symbiotic organisms search algorithm was applied to derive the optimized construction site material layout plan. Finally, the proposed model was applied to a construction project. The required total distance for the dynamic material layout plan was 954,736 m, which saved roughly half of the required distance compared with the fixed material layout plan of 1,659,457 m. This greatly reduced material transportation costs and validated the effectiveness of the proposed model.

[1]  J. K. Walters,et al.  Site Layout of Construction Temporary Facilities Using Enhanced-Geographic Information System ( GIS ) , 2011 .

[2]  Jan Karlshøj,et al.  Review of the Development andImplementation of IFC compatible BIM , 2008 .

[3]  Adil Baykasoglu,et al.  A simulated annealing algorithm for dynamic layout problem , 2001, Comput. Oper. Res..

[4]  Tarek Hegazy,et al.  EvoSite: Evolution-Based Model for Site Layout Planning , 1999 .

[5]  Abraham Warszawski,et al.  Expert systems for crane selection , 1990 .

[6]  S. D. Deshpande,et al.  Computer-aided site layout for construction projects , 1987 .

[7]  Richard L. Francis,et al.  Single Crane Location Optimization , 1983 .

[8]  Iris D. Tommelein,et al.  Sightplan: An Artificial Intelligence Tool to Assist Construction Managers with Site Layout , 1989 .

[9]  Saad H.S. Al-Jibouri,et al.  GENETIC ALGORITHMS FOR CONSTRUCTION SITE LAYOUT IN PROJECT PLANNING , 2002 .

[10]  Charles M. Eastman,et al.  BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors , 2008 .

[11]  R. C. Lee,et al.  CORELAP: Computerized relationship layout planning , 1967 .

[12]  Pierrette P. Zouein MoveSchedule: A planning tool for scheduling space use on construction sites. , 1995 .

[13]  Min-Yuan Cheng,et al.  A hybrid AI-based particle bee algorithm for facility layout optimization , 2011, Engineering with Computers.

[14]  Andrew Kusiak,et al.  Machine layout: an optimization and knowledge-based approach , 1990 .

[15]  Min-Yuan Cheng,et al.  GIS-Based Cost Estimates Integrating with Material Layout Planning , 2001 .

[16]  Khaled A El-Rayes,et al.  Optimal Material Logistics Planning in Congested Construction Sites , 2011 .

[17]  Iris D. Tommelein,et al.  Interactive Dynamic Layout Planning , 1993 .

[18]  Gary David Holt,et al.  Severity diagnosis of productivity problems - A reliability analysis , 1998 .

[19]  Osama Moselhi,et al.  Computer-aided site layout planning , 2006 .

[20]  Clyde B. Tatum,et al.  Construction Plant Requirements for Nuclear Sites , 1981 .

[21]  Inhan Kim,et al.  Open BIM-based quantity take-off system for schematic estimation of building frame in early design stage , 2015, J. Comput. Des. Eng..

[22]  I-Cheng Yeh Construction-Site Layout Using Annealed Neural Network , 1995 .

[23]  Ralph Riedel,et al.  Facilities planning – 4th edition by J.A. Tompkins, J.A. White, Y.A. Bozer and J.M.A. Tanchoco , 2011 .

[24]  Min-Yuan Cheng,et al.  ArcSite: enhanced GIS for construction site layout , 1996 .

[25]  Min-Yuan Cheng,et al.  A hybrid swarm intelligence based particle-bee algorithm for construction site layout optimization , 2012, Expert Syst. Appl..

[26]  Bilal Succar,et al.  Building information modelling framework: A research and delivery foundation for industry stakeholders , 2009 .

[27]  Christophe Cruz,et al.  Semantic Building Information Model and Multimedia for Facility Management , 2010, WEBIST.

[28]  Yu-Cheng Lin,et al.  Laying out the occupant flows in public buildings for operating efficiency , 2012 .

[29]  Sang-Youb Lee,et al.  Optimization of floor-level construction material layout using Genetic Algorithms , 2007 .

[30]  Timo Hartmann,et al.  Aligning building information model tools and construction management methods , 2012 .

[31]  Ines Gloeckner Physical Design Automation Of Vlsi Systems , 2016 .

[32]  Chi-Keung Wong,et al.  Optimisation of site layout planning for multiple construction stages with safety considerations and requirements , 2015 .

[33]  Min-Yuan Cheng,et al.  Symbiotic Organisms Search: A new metaheuristic optimization algorithm , 2014 .

[34]  G. Abdou,et al.  An integrated approach to facilities layout using expert systems , 1990 .

[35]  Frank Schultmann,et al.  Building Information Modeling (BIM) for existing buildings — Literature review and future needs , 2014 .