A goal programming model for aggregate production planning with resource utilization constraint

This paper addresses the aggregate production planning problem with different operational constraints, including production capacity, workforce level, factory locations, machine utilization, storage space and other resource limitations. Three production plants in North America and one in China are considered simultaneously. A pre-emptive goal programming model is developed to maximize profit, minimize repairing cost and maximize machine utilization of the Chinese production plant hierarchically. A set of data from a surface and materials science company is used to test the effectiveness and the efficiency of the proposed model. Results illustrate the flexibility and the robustness of the proposed model by adjusting goal priorities with respect to importance of each objective and the aspiration level with respect to desired target values.

[1]  Carlos Romero,et al.  A general structure of achievement function for a goal programming model , 2004, Eur. J. Oper. Res..

[2]  Philippe Vincke,et al.  Multicriteria Decision-Aid , 1992 .

[3]  A. Ravindran,et al.  Computational feasibility of multi-criteria models of production, planning and scheduling , 1988 .

[4]  Ahmed K. Rifai,et al.  A note on the structure of the goal‐programming model: assessment and evaluation , 1996 .

[5]  A. Charnes,et al.  Management Models and Industrial Applications of Linear Programming , 1961 .

[6]  G. Buxey Production Planning and Scheduling for Seasonal Demand , 1993 .

[7]  Markku Kuula,et al.  Multiperiod production planning carrying over set-up time , 2003 .

[8]  Joseph B. Mazzola,et al.  Multiproduct production planning in the presence of work-force learning , 1998, Eur. J. Oper. Res..

[9]  C. Hwang,et al.  An aggregate production planning model and application of three multiple objective decision methods , 1980 .

[10]  Rasaratnam Logendran,et al.  Aggregate production planning — A survey of models and methodologies , 1992 .

[11]  James R. Evans Applied production and operations management , 1987 .

[12]  H. Pastijn Handbook of critical issues in goal programming: Carlos Romero Pergamon Press, Oxford, 1990, xi + 124 pages, £25.00, ISBN 008 0406610 , 1992 .

[13]  Mehrdad Tamiz,et al.  Multi-objective meta-heuristics: An overview of the current state-of-the-art , 2002, Eur. J. Oper. Res..

[14]  Adil Baykasoğlu MOAPPS 1.0: Aggregate production planning using the multiple-objective tabu search , 2001 .

[15]  Mehrdad Tamiz,et al.  Goal programming for decision making: An overview of the current state-of-the-art , 1998, Eur. J. Oper. Res..