Risk of failures induced by deferred maintenance for a component under inspection policy
暂无分享,去创建一个
[1] W. Wang,et al. Solution algorithms for a nonhomogeneous multi-component inspection model , 2003, Comput. Oper. Res..
[2] A. H. Christer,et al. Reducing Production Downtime Using Delay-Time Analysis , 1984 .
[3] Senlin Zhang,et al. An integrated model for optimizing maintenance and inspection of potential failures , 2009, 2009 8th International Conference on Reliability, Maintainability and Safety.
[4] Jianmin Zhao,et al. Reliability evaluation and optimisation of imperfect inspections for a component with multi-defects , 2007, Reliab. Eng. Syst. Saf..
[5] Luca Podofillini,et al. Risk-informed optimisation of railway tracks inspection and maintenance procedures , 2006, Reliab. Eng. Syst. Saf..