Generalised activity-on-the-node networks for managing uncertainty in projects

Abstract Activity networks, for example PERT , have long been used to plan and manage all kinds of projects within both academia and industry. They are, however, limited by their inflexible structure, and so they cannot explicitly identify and control potential risk points and uncertainties within projects. Generalised activity networks provide a more realistic means of controlling projects by identifying, and analysing, scope possibilities within project plans. Project managers are currently more familiar with the activity-on-the-node network planning techniques on which almost all project management software tools are based. In contrast, generalised activity networks have always been restricted to an activity-on-the-arrow representation. Activity-on-the-node representations have several advantages over activity-on-the-arrow representations, including the ability for logical dependency constraints to be applied directly. The paper introduces the first comprehensive generalised activity-on-the-node representation, thus providing a technique that can identify variability in the scope, cost, and duration of a project.

[1]  C. W. Dawson,et al.  Towards more flexible management of software systems development using meta-models , 1995, Softw. Eng. J..

[2]  Gerald L. Moeller,et al.  Operations Planning with VERT , 1981, Oper. Res..

[3]  P. S. Greenlaw,et al.  Management decision making , 1966 .

[4]  D F Cooper,et al.  Selecting an approach to project time and cost planning , 1985 .

[5]  D. P. Gaver,et al.  Simple stochastic networks: Some problems and procedures , 1970 .

[6]  A. Pritsker,et al.  GERT: Part III—Further Statistical Results; Counters, Renewal Times, and Correlations , 1969 .

[7]  Salah E. Elmaghraby,et al.  Activity networks: Project planning and control by network models , 1977 .

[8]  Bruce M. Woodworth,et al.  A HEURISTIC ALGORITHM FOR RESOURCE LEVELING IN MULTI-PROJECT, MULTI-RESOURCE SCHEDULING , 1975 .

[9]  J. D. Wiest,et al.  Precedence diagramming method: Some unusual characteristics and their implications for project managers , 1981 .

[10]  John B. Kidd Do today's projects need powerful network planning tools? , 1991 .

[11]  E. W. Davis,et al.  Project Management With Cpm, Pert and Precedence Diagramming , 1983 .

[12]  Philip Powell,et al.  Project Risk Analysis Based on Prototype Activities , 1994 .

[13]  John M. Burt,et al.  Conditional Monte Carlo: A Simulation Technique for Stochastic Network Analysis , 1971 .

[14]  B. W. Hollocks,et al.  Book reviewModelling and analysis using Q-GERT networks: A. ALAN B. PRISKER, Wiley, New York, 470 pages, £ 13.15/$ 22.25 , 1978 .

[15]  John B. Kidd Network Analysis for Management Decisions: A Stochastic Approach , 1983 .

[16]  C B Chapman A risk engineering approach to project risk management , 1990 .