Life cycle assessment of a railway bridge: comparison of two superstructure designs

Railway bridges currently encounter the challenges of increasing the load capacity while the environmental sustainability should be achieved. However, it has been realised that the environmental assessment of railway bridges has not been integrated into the decision-making process, the standard guideline and criterion is still missing in this field. Therefore, the implementation of life cycle assessment (LCA) method is introduced into railway bridges. This article provides a systematic bridge LCA model as a guideline to quantify the environmental burdens for the railway bridge structures. A comparison case study between two alternative designs of Banafjäl Bridge is further carried out through the whole life cycle, with the consideration of several key maintenance and end-of-life scenarios. Six impact categories are investigated by using the LCA CML 2001 method and the known life cycle inventory database. Results show that the fixed-slab bridge option has a better environmental performance than the ballasted design due to the ease of maintenances. The initial material manufacture stage is responsible for the largest environmental burden, while the impacts from the construction machinery and material transportations are ignorable. Sensitivity analysis illustrates the maintenance scenario planning and steel recycling have the significant influence on the final results other than the traffic disturbances.

[1]  Yoshito Itoh,et al.  Using CO2 emission quantities in bridge lifecycle analysis , 2003 .

[2]  David Lorenz Sustainable Property Investment for an Energy Efficient Built Environment. Invited Speech , 2008 .

[3]  Guillaume Gillet Simply supported composite railway bridge: a comparison of ballasted and ballastless track alternatives : Case of the Banafjäl Bridge , 2010 .

[4]  A. Horvath,et al.  Assessing the end-of-life impacts of buildings. , 2008, Environmental science & technology.

[5]  C. K. Lee,et al.  Comparison of Environmental Loads With Rail Track Systems Using Simplified Life Cycle Assessment (LCA) , 2008 .

[6]  Rolf Frischknecht,et al.  LCI modelling approaches applied on recycling of materials in view of environmental sustainability, risk perception and eco-efficiency , 2010 .

[7]  James R. Clifton,et al.  State-of-the-art report , 1995 .

[8]  Cynthia K. Dohner U.S. DEPARTMENT OF THE INTERIOR , 1998 .

[9]  R. Frischknecht,et al.  Implementation of Life Cycle Impact Assessment Methods. ecoinvent report No. 3, v2.2 , 2010 .

[10]  Michael D. Fenton Iron and steel recycling in the United States in 1998 , 2001 .

[11]  J. Widman Environmental impact assessment of steel bridges , 1998 .

[12]  Hans-Jürgen Dr. Klüppel,et al.  The Revision of ISO Standards 14040-3 - ISO 14040: Environmental management – Life cycle assessment – Principles and framework - ISO 14044: Environmental management – Life cycle assessment – Requirements and guidelines , 2005 .

[13]  Dimitrios A. Georgakellos,et al.  The use of the LCA polygon framework in waste management , 2006 .

[14]  Gerard Parke,et al.  Environmental impact of brick arch bridge management , 2003 .

[15]  Giovanni Andrea Blengini,et al.  Life cycle of buildings, demolition and recycling potential: A case study in Turin, Italy , 2009 .

[16]  Philip C. Kimmet,et al.  Sustainable Property Investment & Management Key Issues & Major Challenges , 2008 .

[17]  G. Dóka Life Cycle Inventories of Waste Treatment Services , 2003 .