Improving Accuracy of Early Stage Cost Estimation by Revising Categorical Variables in a Case-Based Reasoning Model

AbstractFor the overall success of a construction project, it is very important to accurately estimate the construction cost from the early stage. However, the limited information available in the early stage makes the cost estimation challenging. Recently, there has been an increase in the use of case-based reasoning (CBR) to estimate construction cost in the early stage. Based on the hypothesis that similar problems have similar solutions, CBR searches for the most similar cases (e.g., previous projects) for a given problem (e.g., a new project). However, because no previous project is exactly the same as a new project, the solutions applied to the past project may not work for the new project, especially when there are no sufficient cases stored in the case base. To overcome this limitation, some studies have highlighted the importance of revision algorithms to account for the deviation of the new project and the identified similar past projects. These studies, however, were limited in considering the ...

[1]  Ricardo Miranda Barcia,et al.  Case-Based Reasoning for Cash-Flow Forecasting using Fuzzy Retrieval , 1995, ICCBR.

[2]  Beliz Ozorhon,et al.  Case-Based Reasoning Model for International Market Selection , 2006 .

[3]  Ian F. C. Smith,et al.  Case-Based Spatial Design Reasoning , 1994, EWCBR.

[4]  Tarek Hegazy,et al.  NEURAL NETWORK MODEL FOR PARAMETRIC COST ESTIMATION OF HIGHWAY PROJECTS , 1998 .

[5]  S. Thomas Ng,et al.  Forecast models for actual construction time and cost , 2003 .

[6]  Sevgi Zeynep Dogan,et al.  Determining Attribute Weights in a CBR Model for Early Cost Prediction of Structural Systems , 2006 .

[7]  Nie-Jia Yau,et al.  Case‐Based Reasoning in Construction Management , 1998 .

[8]  Kan Phaobunjong,et al.  Parametric cost estimating model for conceptual cost estimating of building construction projects , 2002 .

[9]  Jean-Marc Desharnais,et al.  A comparison of software effort estimation techniques: Using function points with neural networks, case-based reasoning and regression models , 1997, J. Syst. Softw..

[10]  J. M. Castelain,et al.  Cost Estimation During Design Step: Parametric Method versus Case Based Reasoning Method , 1999 .

[11]  Srinath Perera,et al.  Collaborative case-based estimating and design , 1998 .

[12]  Kyung In Kang,et al.  A case-based reasoning cost estimating model using experience by analytic hierarchy process , 2007 .

[13]  Weng Tat Chan,et al.  Case-based reasoning approach in bid decision making , 2001 .

[14]  Chang-Taek Hyun,et al.  A CBR-based hybrid model for predicting a construction duration and cost based on project characteristics in multi-family housing projects , 2010 .

[15]  Tarek Hegazy,et al.  Predicting cost deviation in reconstruction projects: Artificial neural networks versus regression , 2003 .

[16]  Zhiming Zhang,et al.  Similarity Measures for Retrieval in Case-Based Reasoning Systems , 1998, Appl. Artif. Intell..

[17]  Janet L. Kolodner,et al.  Case-Based Reasoning , 1989, IJCAI 1989.

[18]  Onur Behzat Tokdemir Using case-based reasoning to predict the outcome of construction litigation , 1999 .

[19]  Agnar Aamodt,et al.  Case-Based Reasoning: Foundational Issues, Methodological Variations, and System Approaches , 1994, AI Commun..

[20]  Moonseo Park,et al.  Data Preprocessing–Based Parametric Cost Model for Building Projects: Case Studies of Korean Construction Projects , 2010 .

[21]  D. Lowe,et al.  Predicting construction cost using multiple regression techniques , 2006 .

[22]  Sung Hoon An,et al.  Comparison of construction cost estimating models based on regression analysis, neural networks, and case-based reasoning , 2004 .

[23]  Hans-Dieter Burkhard Similarity and Distance in Case Based Reasoning , 2001, Fundam. Informaticae.

[24]  Hyun-Soo Lee,et al.  Cost estimation model for building projects using case-based reasoning , 2011 .

[25]  Farhi Marir,et al.  CBRefurb: case-based cost estimation , 1995 .

[26]  Gerald Keller,et al.  Statistics for Management and Economics , 1990 .

[27]  ChangTaek Hyun,et al.  MRA-based revised CBR model for cost prediction in the early stage of construction projects , 2012, Expert Syst. Appl..

[28]  Andrzej Kraslawski,et al.  Case-Based Reasoning Approach , 2008 .

[29]  Kyung In Kang,et al.  Hybrid Models of Neural Networks and Genetic Algorithms for Predicting Preliminary Cost Estimates , 2005 .

[30]  Saeed Karshenas,et al.  A Case-Based Reasoning Approach to Construction Cost Estimating , 2002 .

[31]  Garold D. Oberlender,et al.  Predicting Accuracy of Early Cost Estimates using Factor Analysis and Multivariate Regression , 2003 .

[32]  Taehoon Hong,et al.  CBR Revision Model for Improving Cost Prediction Accuracy in Multifamily Housing Projects , 2010 .

[33]  Sevgi Zeynep Dogan,et al.  Using Decision Trees for Determining Attribute Weights in a Case-Based Model of Early Cost Prediction , 2008 .

[34]  Jürgen Bode,et al.  Neural networks for cost estimation: Simulations and pilot application , 2000 .

[35]  Janet L. Kolodner,et al.  An introduction to case-based reasoning , 1992, Artificial Intelligence Review.

[36]  Yaman Barlas,et al.  Formal aspects of model validity and validation in system dynamics , 1996 .

[37]  Yang Miang Goh,et al.  Case-Based Reasoning Approach to Construction Safety Hazard Identification: Adaptation and Utilization , 2010 .

[38]  Rifat Sonmez,et al.  Conceptual cost estimation of building projects with regression analysis and neural networks , 2004 .