From BPR to CPR - conceptualising re-engineering in construction

As construction is a project‐orientated industry, it is suggested in this paper that traditional business process re‐engineering (BPR) will only improve intra‐organisational business processes, not the inter‐organisational normally used to procure construction facilities because of the degree of process incompatibility between participating organisations. The aim of this paper is to explain why traditional BPR is not considered to be an effective method for improving the performance of projects. The paper argues that an alternative to BPR is needed and suggests that construction process re‐engineering, founded on the “new production philosophy” should be used to initiate change at a project level. Models for re‐engineering processes in construction at a company and project level are presented and discussed.

[1]  W. Edwards Deming,et al.  Out of the Crisis , 1982 .

[2]  篠原 勲 NPS, New Production System : JIT crossing industry boundaries , 1988 .

[3]  Daniel T. Jones,et al.  The machine that changed the world : based on the Massachusetts Institute of Technology 5-million dollar 5-year study on the future of the automobile , 1990 .

[4]  Lauri Koskela,et al.  Application of the New Production Philosophy to Construction , 1992 .

[5]  Thomas H. Davenport,et al.  Process Innovation: Reengineering Work Through Information Technology , 1992 .

[6]  John B. Kidd,et al.  Toyota Production System , 1993 .

[7]  Robert W. Keidel Rethinking organizational design , 1994 .

[8]  M. Lynne Markus,et al.  PRECONDITIONS FOR BPR SUCCESS And How to Prevent Failures , 1994 .

[9]  Hal W. Hendrick,et al.  Humanizing Re-Engineering for True Organizational Effectiveness: A Macroergonomic Approach , 1995 .

[10]  Robert W. Grubbström,et al.  Modelling production opportunities -- an historical overview , 1995 .

[11]  M. Zairi Benchmarking for Best Practice: Continuous Learning Through Sustainable Innovation , 1996 .

[12]  J. Peppard,et al.  Broadening visions of business process re-engineering , 1996 .

[13]  Keith Popplewell,et al.  Driving concurrency in a distributed concurrent engineering project team: a specification for an Engineering Moderator , 1996 .

[14]  Kirk D. Fiedler,et al.  Developing strategic perspectives on business process reengineering: From process reconfiguration to organizational change , 1996 .

[15]  Sherif Ali Mohtady Mohamed,et al.  Options for applying BPR in the Australian construction industry , 1996 .

[16]  J. Kelada,et al.  Integrating Reengineering with Total Quality , 1996 .

[17]  A. Gunasekaran,et al.  Process reengineering: A review of enablers , 1997 .

[18]  Chimay J. Anumba,et al.  Concurrent engineering in design-build projects , 1997 .

[19]  Peter E.D. Love,et al.  Putting an engine into re‐engineering: toward a process‐oriented organisation , 1998 .

[20]  Peter E.D. Love,et al.  Concurrent engineering : a strategy for procuring construction projects , 1998 .

[21]  Peter E.D. Love,et al.  Improving the competitiveness of manufacturing companies by continuous incremental change , 1998 .