Production control problem integrating overhaul and subcontracting strategies for a quality deteriorating manufacturing system

We study an unreliable deteriorating manufacturing system that produces conforming and non-conforming parts to satisfy a constant demand product rate. The manufacturing system is comprised of a failure-prone machine. Due to the combined effect of random availability variations and deterioration, the system is not able to fulfill long-term product demand. In particular, when finished goods inventory is positive, clients demand are fulfilled on-time and without delay. When backlog exists, subcontracting options are available at a higher cost to supplement the limited production capacity of the manufacturing system. The effect of deterioration is observed mainly in the quality of the parts produced, since the rate of defectives increases as the machines deteriorate. Overhaul activities can be conducted to mitigate the effect of deterioration. We propose a joint feedback control policy based on a stochastic dynamic programming formulation which aims simultaneously to determine the production and overhaul rates, and the rate at which subcontractors are requested. The proposed joint control policy minimizes the total cost, including the inventory, backlog, repair, overhaul, defectives, production and subcontracting costs, over an infinite planning horizon. To determine the optimal control parameters, we adopt a numerical scheme to solve the optimality equations and a numerical example is presented as an illustration of the approach. The structure of the joint control policy is validated through an extensive sensitivity analysis.

[1]  R. Akella,et al.  Optimal control of production rate in a failure prone manufacturing system , 1985, 1985 24th IEEE Conference on Decision and Control.

[2]  Stanley B. Gershwin,et al.  Analysis of long flow lines with quality and operational failures , 2008 .

[3]  Ali Gharbi,et al.  Simultaneous control of production, repair/replacement and preventive maintenance of deteriorating manufacturing systems , 2011 .

[4]  Stanley B. Gershwin,et al.  Production and Subcontracting Strategies for Manufacturers with Limited Capacity and Volatile Demand , 2004, Ann. Oper. Res..

[5]  Tullio Tolio,et al.  Integrated quality, production logistics and maintenance analysis of multi-stage asynchronous manufacturing systems with degrading machines , 2012 .

[6]  Tullio Tolio,et al.  Integrated quality and production logistics modelling for the design of selective and adaptive assembly systems , 2014 .

[7]  Kouedeu Annie Francie,et al.  Stochastic optimal control of manufacturing systems under production-dependent failure rates , 2014 .

[8]  Dennis E. Blumenfeld,et al.  Designing production systems for quality: Research opportunities from an automotive industry perspective , 2003 .

[9]  Nidhal Rezg,et al.  Joint quality control and preventive maintenance strategy for imperfect production processes , 2010, J. Intell. Manuf..

[10]  Francesco Martinelli,et al.  Optimal cycle production of a manufacturing system subject to deterioration , 2008, Autom..

[11]  Robert Pellerin,et al.  Production control of unreliable manufacturing systems producing defective items , 2011 .

[12]  Tullio Tolio,et al.  Design and management of manufacturing systems for production quality , 2014 .

[13]  Stanley B. Gershwin Design and operation of manufacturing systems: the control-point policy , 2000 .

[14]  Tullio Tolio,et al.  Integrated analysis of quality and production logistics performance in manufacturing lines , 2011 .

[15]  J. Quadrat Numerical methods for stochastic control problems in continuous time , 1994 .

[16]  Ali Gharbi,et al.  Environmental issue in an alternative production–maintenance control for unreliable manufacturing system subject to degradation , 2015 .

[17]  Stanley B. Gershwin,et al.  Integrated quality and quantity modeling of a production line , 2005, OR Spectr..

[18]  Moshe Dror,et al.  Deux Chemicals Inc. Goes Just-in-Time , 2009, Interfaces.

[19]  Robert Pellerin,et al.  Joint optimal lot sizing and production control policy in an unreliable and imperfect manufacturing system , 2013 .

[20]  Panganamala Ramana Kumar,et al.  Optimality of Zero-Inventory Policies for Unreliable Manufacturing Systems , 1988, Oper. Res..

[21]  Ali Gharbi,et al.  Production rate control of an unreliable manufacturing cell with adjustable capacity , 2011 .

[22]  Michael Gregory,et al.  Manufacturing Systems Engineering , 2015 .

[23]  Zied Hajej,et al.  Joint optimisation of maintenance and production policies with subcontracting and product returns , 2014, J. Intell. Manuf..

[24]  R. Suri,et al.  Time-optimal control of parts-routing in a manufacturing system with failure-prone machines , 1980, 1980 19th IEEE Conference on Decision and Control including the Symposium on Adaptive Processes.

[25]  Qing Zhang,et al.  A numerical method in optimal production and setup scheduling of stochastic manufacturing systems , 1997 .

[26]  Ali Gharbi,et al.  Experimental design in production and maintenance control problem of a single machine, single product manufacturing system , 1999 .

[27]  Meir J. Rosenblatt,et al.  Economic Production Cycles with Imperfect Production Processes , 1986 .

[28]  El-Kébir Boukas,et al.  Manufacturing flow control and preventing maintenance: a stochastic control approach , 1988 .

[29]  Ali Gharbi,et al.  Joint optimal production control/preventive maintenance policy for imperfect process manufacturing cell , 2012 .

[30]  Ali Gharbi,et al.  Joint production and subcontracting planning of unreliable multi-facility multi-product production systems , 2015 .

[31]  Ali Gharbi,et al.  Joint production and major maintenance planning policy of a manufacturing system with deteriorating quality , 2013 .

[32]  Zheng Wang,et al.  Heuristic Production and Sale Policy for a Two-Product-Type Manufacturing System With Downward Substitution , 2015, IEEE Transactions on Systems, Man, and Cybernetics: Systems.

[33]  Shib Sankar Sana,et al.  An economic production lot size model in an imperfect production system , 2010, Eur. J. Oper. Res..

[34]  Zhe George Zhang,et al.  A discrete semi-Markov decision model to determine the optimal repair/replacement policy under general repairs , 2000, Eur. J. Oper. Res..

[35]  Robert Pellerin,et al.  Maintenance/production planning with interactive feedback of product quality , 2011 .