A mathematical programming model for optimal cut-off grade policy in open pit mining operations with multiple processing streams
暂无分享,去创建一个
[1] Mohammad Waqar Ali Asad. Optimum cut‐off grade policy for open pit mining operations through net present value algorithm considering metal price and cost escalation , 2007 .
[2] J. Gholamnejad. Incorporation of rehabilitation cost into the optimum cut-off grade determination , 2009 .
[3] C. Musingwini,et al. Development of a computer-aided application using Lane's algorithm to optimize cut-off grade , 2016 .
[4] Bahram Rezai,et al. Incorporating environmental issues into optimum cut-off grades modeling at porphyry copper deposits , 2008 .
[5] Yue Li,et al. Theory and method of genetic-neural optimizing cut-off grade and grade of crude ore , 2009, Expert Syst. Appl..
[6] Kenneth F. Lane,et al. The Economic Definition of Ore: Cut-off Grades in Theory and Practice , 1988 .
[7] B. King. Optimal Mining Principles , 2018 .
[8] Ahmad Asadi,et al. Determination of optimised cut-off grade utilising non-linear programming , 2015, Arabian Journal of Geosciences.
[9] Mohammad Waqar Ali Asad,et al. A review of cut-off grade policy models for open pit mining operations , 2016 .
[10] K Dagdelen,et al. CUT-OFF GRADE OPTIMIZATION FOR LARGE SCALE MULTI-MINE, MULTI-PROCESS MINING OPERATIONS , 2007 .
[11] A. Bascetin A. Nieto. Determination of optimal cut-off grade policy to optimize NPV using a new approach with optimization factor , 2007 .
[12] Erkan Topal,et al. Net present value maximization model for optimum cut-off grade policy of open pit mining operations , 2011 .
[13] Roussos Dimitrakopoulos,et al. Optimal production scale of open pit mining operations with uncertain metal supply and long-term stockpiles , 2012 .
[14] K. Dagdelen,et al. Value creation through strategic mine planning and cutoff-grade optimization , 2008 .
[15] Mohammad Waqar Ali Asad. Cutoff grade optimization algorithm with stockpiling option for open pit mining operations of two economic minerals , 2005 .