Travelling safely and comfortably on high-speed railway lines requires excellent conditions of the whole railway infrastructure in general and of the railway track geometry in particular. The maintenance process required to achieve such excellent conditions is complex and expensive, demanding a large amount of both human and technical resources. In this framework, choosing the right maintenance strategy becomes a critical issue. A reliable simulation of the railway geometry ageing process would offer a great advantage for the optimization of planning and scheduling of maintenance activities. A fundamental requirement for such simulation is a statistical model describing the behaviour of the railway track geometry deterioration as well as the effects of maintenance activities. The French railway operator SNCF has been periodically measuring the geometrical characteristics of its high-speed network since its commissioning (i.e. for more than 20 years now). These records are an excellent data source to achieve a sound statistical description of the process. In this paper a new system identification method to obtain such simulations is presented. The proposed method uses a grey-box model: a model structure and its constraints are specified basing on previous knowledge of the process to be identified, and then the set of parameter values which best fits the signal measurements is searched. As previous knowledge indicates that the process is non-linear, parameter values are searched by means of the Levenberg–Marquardt algorithm, an iterative technique that finds a local minimum of a function that is expressed as the sum of squares of non-linear functions. Furthermore, the presented model is extended in order to analyse the effect of the variation of factors influencing the ageing process (e.g. operational speed). Finally, the method is applied and validated with real data of a French high-speed TGV line.
[1]
H. Chang,et al.
A multi-stage linear prediction model for the irregularity of the longitudinal level over unit railway sections
,
2010
.
[2]
Bernhard Lichtberger.
Das System Gleis und seine Instandhaltung
,
2007
.
[3]
Wei-Yin Loh,et al.
Classification and regression trees
,
2011,
WIREs Data Mining Knowl. Discov..
[4]
D. Marquardt.
An Algorithm for Least-Squares Estimation of Nonlinear Parameters
,
1963
.
[5]
Carolina Evelyn Meier-Hirmer.
Modèles et techniques probabilistes pour l'optimisation des stratégies de maintenance : application au domaine ferroviaire
,
2007
.
[6]
Inmaculada Gallego,et al.
Track deterioration in high-speed railways
,
2007
.
[7]
M. Kendall,et al.
Classical inference and the linear model
,
1999
.
[8]
佐藤 健一.
Lévy processes and infinitely divisible distributions
,
2013
.
[9]
Peter Veit.
Track Quality - Luxury or Necessity?
,
2007
.
[10]
C. Esveld.
Modern railway track
,
1989
.
[11]
Eckehard Schnieder,et al.
A Heuristic Approach to Railway Track Maintenance Scheduling
,
2010
.
[12]
Stanislav Jovanovic,et al.
Railway track quality assessment and related decision making
,
2004,
2004 IEEE International Conference on Systems, Man and Cybernetics (IEEE Cat. No.04CH37583).
[13]
Michel Roussignol,et al.
A Decision Support System for Track Maintenance
,
2006
.
[14]
Per Hokstad,et al.
RAMS Management of Railway Tracks
,
2008
.