Final Report for NCHRP Report 581: Design of Construction Work Zones on High-Speed Highways

This document is the contractor's final report on the research activities used to develop NCHRP Report 581, "Design of Construction Work Zones on High-Speed Highways." NCHRP Report 581 explores an approach for the selection of an appropriate construction work zone type; offers suggested guidance for the design of geometric features, including horizontal and vertical alignment, cross-sectional features, and barrier placement; and examines a variety of ancillary features such as drainage systems, lighting, and surface type. As part of the research associated with this activity, a work zone prediction model and user's guide were created to help estimate free-flow vehicle speeds through two types of construction work zones on four lane freeways--single lane closures and median crossovers.

[1]  Jun Wang,et al.  Investigation of Highway Work Zone Crashes: What We Know and What We Don't Know , 1996 .

[2]  Shawn Turner,et al.  Estimates of Work Zone Exposure on the National Highway System in 2001 , 2004 .

[3]  A. Tarko,et al.  Safety Models for Rural Freeway Work Zones , 2000 .

[4]  N J Garber,et al.  Crash characteristics at work zones. , 2001 .

[5]  Martin T. Hagan,et al.  Neural network design , 1995 .

[6]  C Zegeer SAFETY EFFECTIVENESS OF HIGHWAY DESIGN FEATURES. VOLUME III: CROSS SECTIONS , 1992 .

[7]  J W Hall,et al.  CHARACTERISTICS OF CONSTRUCTION-ZONE ACCIDENTS , 1989 .

[8]  A. Khattak,et al.  Effects of work zone presence on injury and non-injury crashes. , 2002, Accident; analysis and prevention.

[9]  Kumares C. Sinha,et al.  Analysis of Crash Rates at Interstate Work Zones in Indiana , 1996 .

[10]  J D Michie REPORTS ON TRAFFIC FLOW AND SAFETY APPLICATIONS OF ROAD BARRIERS: 2. DEVELOPMENT AND APPLICATION OF POSITIVE BARRIER WARRANTS IN HIGHWAY CONSTRUCTION ZONES , 2000 .

[11]  W Ressel TRAFFIC FLOW AND CAPACITY AT WORK SITES ON FREEWAYS. HIGHWAY CAPACITY AND LEVEL OF SERVICE. PROCEEDINGS OF THE INTERNATIONAL SYMPOSIUM ON HIGHWAY CAPACITY, KARLSRUHE, GERMANY, 24-27 JULY 1991 , 1991 .

[12]  J. J. Wang,et al.  PLANNING AND SCHEDULING WORK ZONE TRAFFIC CONTROL , 1981 .

[13]  R A Zimmer,et al.  RECOMMENDED PROCEDURES FOR THE SAFETY PERFORMANCE EVALUATION OF HIGHWAY FEATURES , 1993 .

[14]  Gerald L Ullman,et al.  ACCIDENTS AT ENTRANCE RAMPS IN LONG-TERM CONSTRUCTION WORK ZONES , 1992 .

[15]  R L Morgan TEMPORARY RUMBLE STRIPS , 2003 .

[16]  Kenneth R. Agent,et al.  HIGHWAY ACCIDENTS IN CONSTRUCTION AND MAINTENANCE WORK ZONES , 1990 .

[17]  Frank N Lisle,et al.  EVALUATION OF TIMBER BARRICADES AND PRECAST CONCRETE TRAFFIC BARRIERS FOR USE IN HIGHWAY CONSTRUCTION AREAS , 1978 .

[18]  Tae-Jun Ha,et al.  DETAILED STUDY OF ACCIDENT EXPERIENCE IN CONSTRUCTION AND MAINTENANCE ZONES , 1995 .

[19]  Conrad L Dudek,et al.  Construction costs and safety impacts of work zone traffic control strategies, Volume 1: final report , 1989 .

[20]  Zoltan Anthony Nemeth,et al.  ACCIDENT CHARACTERISTICS BEFORE, DURING, AND AFTER SAFETY UPGRADING PROJECTS ON OHIO'S RURAL INTERSTATE SYSTEM , 1978 .

[21]  Walker,et al.  EFFECTIVE COUNTERMEASURES TO REDUCE ACCIDENTS IN WORK ZONES , 1999 .

[22]  J C Glennon ROADSIDE SAFETY IMPROVEMENT PROGRAMS ON FREEWAYS - A COST-EFFECTIVE PRIORITY APPROACH , 1974 .

[23]  Jerry L Graham,et al.  ACCIDENT ANALYSES OF HIGHWAY CONSTRUCTION ZONES , 1978 .

[24]  A. Khattak,et al.  Injury Severity and Total Harm in Truck-Involved Work Zone Crashes , 2004 .

[25]  Kay Fitzpatrick,et al.  DETERMINATION OF STOPPING SIGHT DISTANCES , 1997 .

[26]  Karin M Bauer,et al.  Work Zone Speed Limit Procedure , 1999 .

[27]  R A Krammes,et al.  ANALYSIS OF ACCIDENTS AT LONG-TERM CONSTRUCTION PROJECTS IN TEXAS. INTERIM REPORT. REVISED EDITION , 1991 .

[28]  K. Dixon,et al.  Analysis of Fatal Crashes in Georgia Work Zones , 2000 .

[29]  D L Sicking,et al.  ROADSIDE SAFETY ANALYSIS PROGRAM (RSAP)--ENGINEER'S MANUAL , 2003 .

[30]  R A Krammes,et al.  UPDATED CAPACITY VALUES FOR SHORT-TERM FREEWAY WORK ZONE LANE CLOSURES , 1994 .

[31]  Paul J Carlson,et al.  Evaluation of Speed Displays and Rumble Strips at Rural-Maintenance Work Zones , 2001 .