Activity planning processes in the Agent-based Dynamic Activity Planning and Travel Scheduling (ADAPTS) model

This paper describes the representation of the activity planning process utilized in a new activity-based microsimulation model called the ADAPTS (Agent-based Dynamic Activity Planning and Travel Scheduling) model, which dynamically simulates activity and travel planning and scheduling. The model utilizes a dynamic activity planning framework within the larger overall microsimulation system, which is a computational process model that attempts to replicate the decisions which comprise time-dependent activity scheduling. The model presents a step forward in which the usual concepts of activity generation and activity scheduling are significantly enhanced by adding an additional component referred to as activity planning in which the various attributes which describe the activity are determined. The model framework, therefore, separates activity planning from activity generation and treats all three components, generation, planning and scheduling, as separate discrete but dynamic events within the overall microsimulation. The development of the planning order model, which determines when and in what order each activity planning decision is made is the specific focus of this paper. The models comprising the planning order framework are developed using recent survey data from a GPS-based prompted recall survey. The model development, estimation, validation, and its use within the overall ADAPTS system are discussed. A significant finding of the study is the verification of the apparent transferability of the activity planning order model.

[1]  Sean T. Doherty,et al.  Examining the Nature and Extent of the Activity-Travel Preplanning Decision Process , 2008 .

[2]  Reginald G. Golledge,et al.  Real-time Tracking of Activity Scheduling/Schedule Execution Within A Unified Data Collection Framework , 2004 .

[3]  Ming Lee,et al.  An empirical investigation on the dynamic processes of activity scheduling and trip chaining , 2004 .

[4]  Joshua Auld,et al.  Framework for the development of the Agent-based Dynamic Activity Planning and Travel Scheduling (ADAPTS) model , 2009 .

[5]  Joshua Auld,et al.  An automated GPS-based prompted recall survey with learning algorithms , 2009 .

[6]  Tsu-Tan Fu,et al.  A limited information estimator for the multivariate ordinal probit model , 2000 .

[7]  Martin E H Lee-Gosselin,et al.  A Data Collection Strategy for Perceived and Observed Flexibility in the Spatio-Temporal Organization of Household Activities and Associated Travel , 2005 .

[8]  A. Zellner An Efficient Method of Estimating Seemingly Unrelated Regressions and Tests for Aggregation Bias , 1962 .

[9]  Barbara Hayes-Roth,et al.  A Cognitive Model of Planning , 1979, Cogn. Sci..

[10]  Sean T. Doherty,et al.  2005 Fred Burggraf Award, Planning and Environment: How Far in Advance Are Activities Planned?: Measurement Challenges and Analysis , 2005 .

[11]  Eric I. Pas,et al.  STATE OF THE ART AND RESEARCH OPPORTUNITIES IN TRAVEL DEMAND: ANOTHER PERSPECTIVE , 1985 .

[12]  Matthew J. Roorda,et al.  Analysis of Planning Decisions during the Activity-Scheduling Process , 2008 .

[13]  Yonghai Li,et al.  Likelihood analysis of the multivariate ordinal probit regression model for repeated ordinal responses , 2008, Comput. Stat. Data Anal..

[14]  J. Ashford,et al.  Multi-variate probit analysis. , 1970, Biometrics.

[15]  Eric J. Miller,et al.  Propositions for Modelling Household Decision-Making , 2005 .

[16]  Sean T. Doherty,et al.  Mixed Logit Model of Activity-Scheduling Time Horizon Incorporating Spatial–Temporal Flexibility Variables , 2005 .

[17]  Michael G. McNally,et al.  Experiments with Computerized Self-Administrative Activity Survey , 2001 .

[18]  Matthew J. Roorda,et al.  Implementation of Scheduling Conflict Resolution Model in Activity-Scheduling System , 2009 .

[19]  Allen Newell,et al.  Human Problem Solving. , 1973 .

[20]  Luis F. Miranda-Moreno,et al.  A week in the life of baby boomers: how do they see the spatial–temporal organization of their activities and travel? , 2008 .

[21]  Abolfazl Mohammadian,et al.  Modeling activity scheduling time horizon: Duration of time between planning and execution of pre-planned activities , 2006 .

[22]  Harry Timmermans,et al.  Changing the timing of activities in resolving Scheduling Conflicts , 2006 .

[23]  Matthew J. Roorda,et al.  Computerized Household Activity-Scheduling Survey for Toronto, Canada, Area: Design and Assessment , 2004 .

[24]  Sean T. Doherty,et al.  Analysis of Factors Affecting the Frequency and Type of Activity Schedule Modification , 2005 .

[25]  T. Arentze,et al.  Modeling Individuals’ Activity-Travel Rescheduling Heuristics: Theory and Numerical Experiments , 2002 .

[26]  Joshua Auld,et al.  Urban Travel Route and Activity Choice Survey , 2010 .

[27]  Ta Theo Arentze,et al.  Experiences with developing ALBATROSS: a learning-based transportation oriented simulation system , 1998 .

[28]  C H Chang-Hyeon Joh,et al.  Measuring and predicting adaptation in multidimensional activity-travel patterns , 2004 .

[29]  Joshua A. Auld,et al.  Agent-based Dynamic Activity Planning and Travel Scheduling Model: Data Collection and Model Development , 2011 .

[30]  Joshua Auld,et al.  Analysis of Activity Conflict Resolution Strategies , 2008 .

[31]  Matthew J. Roorda,et al.  Design and Assessment of the Toronto Area Computerized Household Activity Scheduling Survey , 2004 .

[32]  Davy Janssens,et al.  Modeling Short-Term Dynamics in Activity-Travel Patterns: From Aurora to Feathers , 2008 .

[33]  Sangho Choo,et al.  How do people respond to congestion mitigation policies? A multivariate probit model of the individual consideration of three travel-related strategy bundles , 2008 .

[34]  T. Gärling,et al.  Computational-Process Modelling of Household Travel Decisions Using a Geographical Information System , 1994 .

[35]  Joshua Auld,et al.  Modeling activity conflict resolution strategies using scheduling process data , 2009 .

[36]  R. McKelvey,et al.  A statistical model for the analysis of ordinal level dependent variables , 1975 .

[37]  Sean T. Doherty,et al.  How Far in Advance Are Activities Planned? , 2005 .

[38]  Tommy Gärling,et al.  Computational-Process Modelling of Household Activity Scheduling , 1993 .