A New Scheduling Strategy for Risk Mitigation

Risk mitigation is essential for risk management because it aims to reduce or eliminate risks. A good risk mitigation strategy aims to make the best use of resources and reduces the project risk as much as possible. A meaningful strategy should at least have a higher performance than a "Random strategy". In this paper, we (1) propose a new scheduling strategy, "Greedy strategy", for risk mitigation, (2) compare the performance of Greedy strategy with existing scheduling strategies, and (3) compare the performance of all identified scheduling strategies (Greedy strategy and existing strategies) with the Random strategy. The results show that the proposed strategy has a better performance than existing strategies, and all existing strategies and Greedy strategy have a better performance than "Random strategy".

[1]  Rob J. Kusters,et al.  Dealing with risk: a practical approach , 1996, J. Inf. Technol..

[2]  Glyn A. Holton Defining Risk , 2004 .

[3]  Xin-She Yang,et al.  Introduction to Algorithms , 2021, Nature-Inspired Optimization Algorithms.

[4]  Peng Zhou Managing time elements of risk , 2013 .

[5]  W. Duncan A GUIDE TO THE PROJECT MANAGEMENT BODY OF KNOWLEDGE , 1996 .

[6]  Hareton K. N. Leung Variants of Risk and Opportunity , 2010, 2010 Asia Pacific Software Engineering Conference.

[7]  Kalle Lyytinen,et al.  A framework for identifying software project risks , 1998, CACM.

[8]  H. Leung,et al.  A risk management methodology with risk dependencies , 2010 .

[9]  Hareton K. N. Leung,et al.  Scheduling Strategies for Risk Mitigation , 2018, ICSOFT.

[10]  Susan A. Sherer,et al.  Managing risk beyond the control of IS managers: the role of business management , 2004, 37th Annual Hawaii International Conference on System Sciences, 2004. Proceedings of the.

[11]  Hareton K. N. Leung,et al.  A Stochastic Simulation Model for Risk Management Process , 2012, 2012 19th Asia-Pacific Software Engineering Conference.

[12]  Sandra G. Behrens,et al.  Software risk evaluation (SRE) method description (version 2.0) , 1999 .

[13]  Hareton K. N. Leung,et al.  Improving Risk Management with Modeling Time Element , 2011 .

[14]  Hareton K. N. Leung,et al.  A Risk Management Methodology for Project Risk Dependencies , 2011, IEEE Transactions on Software Engineering.

[15]  Standard for Software Life Cycle Processes — Risk Management , 2001 .

[16]  Tim Lister Point: Risk Management Is Project Management for Adults , 1997, IEEE Softw..