Critical success factors for implementing integrated construction project delivery

Purpose The purpose of this paper is to identify the critical success factors (CSFs) to implement integrated project delivery (IPD) systems in the Korean construction industry. Design/methodology/approach This study categorized potential CSFs and analyzed them using factor analysis and multiple regression analysis to choose the best ones based on responses from Korean construction experts. Findings In total, 29 potential factors were selected and categorized into 7 CSFs using factor analysis. Originality/value The outcomes of the study are useful as a reference for applying the IPD system in different developing countries and mid-sized construction industries.

[1]  João Pedro Poças Martins,et al.  Framework for the coordinated application of two different integrated project delivery platforms , 2014 .

[2]  Frank Schultmann,et al.  Building Information Modeling (BIM) for existing buildings — Literature review and future needs , 2014 .

[3]  Ghang Lee,et al.  Adoption of Virtual Technology to the Development of a BIM based PMIS , 2013 .

[4]  Lianying Zhang,et al.  Sharing Tacit Knowledge for Integrated Project Team Flexibility: Case Study of Integrated Project Delivery , 2013 .

[5]  Awad S. Hanna,et al.  Quantifying Performance for the Integrated Project Delivery System as Compared to Established Delivery Systems , 2013 .

[6]  Pertti Lahdenperä,et al.  Making sense of the multi-party contractual arrangements of project partnering, project alliancing and integrated project delivery , 2012 .

[7]  David R. Riley,et al.  Project Delivery Metrics for Sustainable, High-Performance Buildings , 2011 .

[8]  Soon-Wook Kwon,et al.  An Analysis on the Perception of Domestic Construction Engineer to Introduce IPD , 2011 .

[9]  Burcin Becerik-Gerber,et al.  Understanding Construction Industry Experience and Attitudes toward Integrated Project Delivery , 2010 .

[10]  Jin-Ho Kim,et al.  Effective Application of PMIS through Analysis of Barriers At the Development of PMIS , 2005 .

[11]  Park Kyung-il,et al.  Country report from South Korea , 2016 .

[12]  Randall Deutsch,et al.  Integrated Project Delivery Overview , 2013 .

[13]  Benedict D. Ilozor,et al.  Building Information Modeling and Integrated Project Delivery in the Commercial Construction Industry: A Conceptual Study , 2012 .

[14]  S. Paik,et al.  A Method for the Application of IPD to Domestic Construction Industry through SWOT Analysis , 2012 .

[15]  Glenn Ballard,et al.  STRUCTURING IDEAL PROJECT DELIVERY SYSTEM , 2010 .