Critical success factors for implementing integrated construction project delivery
暂无分享,去创建一个
[1] João Pedro Poças Martins,et al. Framework for the coordinated application of two different integrated project delivery platforms , 2014 .
[2] Frank Schultmann,et al. Building Information Modeling (BIM) for existing buildings — Literature review and future needs , 2014 .
[3] Ghang Lee,et al. Adoption of Virtual Technology to the Development of a BIM based PMIS , 2013 .
[4] Lianying Zhang,et al. Sharing Tacit Knowledge for Integrated Project Team Flexibility: Case Study of Integrated Project Delivery , 2013 .
[5] Awad S. Hanna,et al. Quantifying Performance for the Integrated Project Delivery System as Compared to Established Delivery Systems , 2013 .
[6] Pertti Lahdenperä,et al. Making sense of the multi-party contractual arrangements of project partnering, project alliancing and integrated project delivery , 2012 .
[7] David R. Riley,et al. Project Delivery Metrics for Sustainable, High-Performance Buildings , 2011 .
[8] Soon-Wook Kwon,et al. An Analysis on the Perception of Domestic Construction Engineer to Introduce IPD , 2011 .
[9] Burcin Becerik-Gerber,et al. Understanding Construction Industry Experience and Attitudes toward Integrated Project Delivery , 2010 .
[10] Jin-Ho Kim,et al. Effective Application of PMIS through Analysis of Barriers At the Development of PMIS , 2005 .
[11] Park Kyung-il,et al. Country report from South Korea , 2016 .
[12] Randall Deutsch,et al. Integrated Project Delivery Overview , 2013 .
[13] Benedict D. Ilozor,et al. Building Information Modeling and Integrated Project Delivery in the Commercial Construction Industry: A Conceptual Study , 2012 .
[14] S. Paik,et al. A Method for the Application of IPD to Domestic Construction Industry through SWOT Analysis , 2012 .
[15] Glenn Ballard,et al. STRUCTURING IDEAL PROJECT DELIVERY SYSTEM , 2010 .