Experimental and Numerical Investigation of the Tensile Behavior of Blind-Bolted T-Stub Connections to Concrete-Filled Circular Columns

This paper presents the results of two series of experimental and analytical studies on the structural behavior of an innovative moment-resisting connection to concrete-filled circular hollow sections using blind bolts. The first part of the paper presents a large-scale T-stub connection with full instrumentation tested to failure in tension, and the second part presents a series of pullout tests to explore the anchorage behavior of cogged bars within concrete-filled steel tubes. The favorable strength and stiffness characteristics of this type of connection showed that it could be an alternative to conventional welded moment-resisting connections. A 3D finite-element (FE) model was developed to simulate the behavior of blind-bolted T-stub connections when subject to tension. The FE model took into account material nonlinearities, geometrical discontinuities, and complex contact interactions among the bolt heads, tube wall, end plates, and nuts. The FE results were found to be in good quantitative agreement with the actual connection behavior. A stiffness model composed of various nonlinear springs was also developed to predict the pullout behavior of cogged bars within concrete-filled steel tubes. The cogged extensions to the blind bolts were very effective in relieving the stress concentration on the thin tube wall. The tensile load can be shared between membrane action of the tube wall and anchorage of the cogged bars. Thus, by using the blind-bolted connections with cogged extensions to connect the beam flanges to the column, moment transfer between the beam and column can be effectively achieved within a structural frame of composite construction.

[1]  Parviz Soroushian,et al.  Pullout Behavior of Hooked Bars in Exterior Beam-Column Connections , 1988 .

[2]  Archibald N. Sherbourne,et al.  3D simulation of bolted connections to unstiffened columns—I. T-stub connections , 1996 .

[3]  James A. Swanson,et al.  BOLTED STEEL CONNECTIONS: TESTS ON T-STUB COMPONENTS , 2000 .

[4]  Roberto T. Leon,et al.  Advanced finite element modeling of bolted T-stub connection components , 2002 .

[5]  Comite Euro-International du Beton,et al.  CEB-FIP Model Code 1990 , 1993 .

[6]  J. Buick Davison,et al.  Moment-capacity and rotational stiffness of endplate connections to concrete-filled tubular columns with flowdrilled connectors , 1999 .

[7]  Emad Gad,et al.  Development of a photogrammetry system to monitor building movement , 2004 .

[8]  Yousef.M. Alostaz,et al.  Experimental Behavior of Connections to Concrete-filled Steel Tubes , 1998 .

[9]  Anne Gardner,et al.  Experimental investigation of the stiffness of critical components in a moment-resisting composite connection , 2005 .

[10]  Vitelmo V. Bertero,et al.  Local bond stress-slip relationships of deformed bars under generalized excitations , 1982 .

[11]  S Klippel Recent Design Developments with Blind Mechanically Operated Bolt Systems for Use with Hollow Section Steelwork , 1998 .

[12]  Ahmed Ghobarah,et al.  Blind Bolting W‐Shape Beams to HSS Columns , 1993 .

[13]  Anne Gardner,et al.  Feasibility study for blind-bolted connections to concrete-filled circular steel tubular columns , 2006 .