Approaches to Calculating Systems Engineering Schedule in Parametric Cost Models
暂无分享,去创建一个
[1] Ricardo Valerdi,et al. Extensions of COSYSMO to Represent Reuse , 2006 .
[2] Gan Wang,et al. 2.2.2 Harmonizing Systems and Software Cost Estimation , 2009 .
[3] Frederick P. Brooks,et al. The Mythical Man-Month: Essays on Softw , 1978 .
[4] Ricardo Valerdi,et al. THE CONSTRUCTIVE SYSTEMS ENGINEERING COST MODEL (COSYSMO) , 2005 .
[5] Ricardo Valerdi,et al. Reducing Risk and Uncertainty in COSYSMO Size and Cost Drivers: Some Techniques for Enhancing Accuracy , 2007 .
[6] C. Northcote Parkinson,et al. Parkinson's Law or the Pursuit of Progress , 1958 .
[7] Michael A. Ross,et al. Next Generation Software Estimating Framework: 25 Years and Thousands of Projects Later , 2008 .
[8] Ellis Horowitz,et al. Software Cost Estimation with COCOMO II , 2000 .
[9] P. Kidwell,et al. The mythical man-month: Essays on software engineering , 1996, IEEE Annals of the History of Computing.
[10] Lawrence H. Putnam. Software Cost Estimating and Life-Cycle Control , 1980 .
[11] Barry W. Boehm,et al. Software Engineering Economics , 1993, IEEE Transactions on Software Engineering.