A Modified Unit Commitment and Generation Control for Utilities with Large Wind Generation Penetrations
暂无分享,去创建一个
[1] M. Lotfalian,et al. Simulation and Assessment of Wind Array Power Variations Based on Simultaneous Wind Speed Measurements , 1984, IEEE Transactions on Power Apparatus and Systems.
[2] Robert A. Schlueter,et al. Operations model for utilities using wind-generator arrays. Final report , 1981 .
[3] T. W. Reddoch,et al. Operational concepts for large wind-turbine arrays , 1981 .
[4] B. W. Jones,et al. Analysis method for non-schedulable generation in electric systems , 1982 .
[5] Anjan Bose,et al. Scheduling of Generation and Reserve Margin Using Dynamic and Linear Programming , 1981, IEEE Transactions on Power Apparatus and Systems.
[6] Stephen Lee,et al. Load-Following and Spinning-Reserve Penalties for Intermittent Generation , 1981, IEEE Transactions on Power Apparatus and Systems.
[7] Robert A. Schlueter,et al. Impact of storm fronts on utilities with WECS arrays. Final report , 1979 .