COMPARISON OF ANN AND CBR MODELS FOR EARLY COST PREDICTION OF STRUCTURAL SYSTEMS

Reasonably accurate cost estimation of the structural system is quite desirable at the early stages of the design process of a construction project. However, the numerous interactions among the many cost-variables make the prediction difficult. Artificial neural networks (ANN) and case-based reasoning (CBR) are reported to overcome this difficulty. This paper presents a comparison of CBR and ANN augmented by genetic algorithms (GA) conducted by using spreadsheet simulations. GA was used to determine the optimum weights for the ANN and CBR models. The cost data of twenty-nine actual cases of residential building projects were used as an example application. Two different sets of cases were randomly selected from the data set for training and testing purposes. Prediction rates of 84% in the GA/CBR study and 89% in the GA/ANN study were obtained. The advantages and disadvantages of the two approaches are discussed in the light of the experiments and the findings. It appears that GA/ANN is a more suitable model for this example of cost estimation where the prediction of numerical values is required and only a limited number of cases exist. The integration of GA into CBR and ANN in a spreadsheet format is likely to improve the prediction rates.

[1]  Simon Haykin,et al.  Neural Networks: A Comprehensive Foundation , 1998 .

[2]  Lawrence. Davis,et al.  Handbook Of Genetic Algorithms , 1990 .

[3]  David Beasley,et al.  An overview of genetic algorithms: Part 1 , 1993 .

[4]  J. Shi REDUCING PREDICTION ERROR BY TRANSFORMING INPUT DATA FOR NEURAL NETWORKS , 2000 .

[5]  Harry E. Pulver,et al.  Construction estimates and costs , 1960 .

[6]  Yoram Reich,et al.  Machine Learning Techniques for Civil Engineering Problems , 1997 .

[7]  Laurene V. Fausett,et al.  Fundamentals Of Neural Networks , 1993 .

[8]  Janet L. Kolodner,et al.  Case-Based Reasoning , 1989, IJCAI 1989.

[9]  Tarek Hegazy,et al.  NEURAL NETWORK MODEL FOR PARAMETRIC COST ESTIMATION OF HIGHWAY PROJECTS , 1998 .

[10]  Sevgi Zeynep Dogan,et al.  Determining Attribute Weights in a CBR Model for Early Cost Prediction of Structural Systems , 2006 .

[11]  Agnar Aamodt,et al.  Case-Based Reasoning: Foundational Issues, Methodological Variations, and System Approaches , 1994, AI Commun..

[12]  Abiodun Olukayode Olotuah Recourse to earth for low-cost housing in Nigeria , 2002 .

[13]  H. M. Adorf,et al.  Connectionism and neural networks , 1989 .

[14]  Uma G. Gupta How Case-Based Reasoning Solves New Problems , 1994 .

[15]  Geoffrey E. Hinton,et al.  Learning representations by back-propagating errors , 1986, Nature.

[16]  Farhi Marir,et al.  Case-based reasoning: a categorized bibliography , 1994, The Knowledge Engineering Review.

[17]  S. Keoki. Sears,et al.  Construction Project Management , 1972 .