Approximately predicting the cost and duration of school reconstruction projects in Taiwan
暂无分享,去创建一个
[1] Geoffrey E. Hinton,et al. Learning internal representations by error propagation , 1986 .
[2] Derek H.T. Walker,et al. An investigation into construction time performance , 1995 .
[3] Geoffrey E. Hinton,et al. A general framework for parallel distributed processing , 1986 .
[4] Mohan M. Kumaraswamy,et al. Determinants of construction duration , 1995 .
[5] David Lowe,et al. Data modelling and the application of a neural network approach to the prediction of total construction costs , 2002 .
[6] Trefor P. Williams. Predicting completed project cost using bidding data , 2002 .
[7] Wei-Chih Wang,et al. Contractor selection by the most advantageous tendering approach in Taiwan , 2003 .
[8] Mohan M. Kumaraswamy,et al. A study of the factors affecting construction durations in Hong Kong , 1995 .
[9] Michael D Dalzell,et al. Everything old is new again. , 2007, Biotechnology healthcare.
[10] Albert P.C. Chan. Modelling building durations in Hong Kong , 1999 .
[11] Goh Bee-Hua,et al. An evaluation of the accuracy of the multiple regression approach in forecasting sectoral construction demand in Singapore , 1999 .
[12] George J. Tamaro,et al. Exchange Place Station Subsurface Reconstruction and Improvements , 1992 .
[13] Mohan M. Kumaraswamy,et al. Modelling and predicting construction durations in Hong Kong public housing , 1999 .
[14] Albert P.C. Chan. Time–cost relationship of public sector projects in Malaysia , 2001 .
[15] Dov Kaminetzky,et al. Success or Failure: A Tale of Two Projects , 1996 .
[16] Tarek Hegazy,et al. Predicting cost deviation in reconstruction projects: Artificial neural networks versus regression , 2003 .
[17] Vernon Ireland,et al. The role of managerial actions in the cost, time and quality performance of high-rise commercial building projects , 1985 .