A Modeling Approach to Analyze Variability of Remanufacturing Process Routing

Remanufacturing is a practice of growing importance due to increasing environmental awareness and regulations. However, little research focuses on stochastic remanufacturing process routings (RPR). This paper presents an analytical method, where four Graphical Evaluation and Review Technique (GERT)-based RPR models are proposed to mathematically represent and analyze the variability of remanufacturing task sequences. In particular, with the method, the probability of individual processes being taken in a remanufacturing system and the time associated with them can be efficiently determined. The proposed method is demonstrated through the remanufacturing of used lathe spindles and telephones, and verified by Arena simulation. Numerical experiments that investigate the relationships between RPR dynamics and other system parameters (such as inventory control for due-time performance and time buffer size for bottleneck control) are included.

[1]  Congbo Li,et al.  Uncertainty management in remanufacturing: A review , 2012, 2012 IEEE International Conference on Automation Science and Engineering (CASE).

[2]  Michael E. Ketzenberg,et al.  The value of information in a capacitated closed loop supply chain , 2009, Eur. J. Oper. Res..

[3]  Manju Agarwal,et al.  GERT Analysis of m-Consecutive-k-Out-of-n Systems , 2007, IEEE Trans. Reliab..

[4]  Kurt A. Rosentrater,et al.  Developing a framework for applying disassembly planning and demanufacturing modeling to organic processing waste streams , 2005, SPIE Optics East.

[5]  Robert M. Nickel,et al.  Project-based Design of a Biometric Face Recognition System , 2012 .

[6]  Michael R. Galbreth,et al.  Optimal Acquisition Quantities in Remanufacturing with Condition Uncertainty , 2010 .

[7]  Ying Tang,et al.  Simulation Of A Disassembly To Order System , 2004 .

[8]  MengChu Zhou,et al.  Demanufacturing System Simulation and Modelig , 2001 .

[9]  Gauri Shankar,et al.  GERT analysis of a two-unit warm standby system with repair , 1995 .

[10]  Ying Tang,et al.  A Learning Strategy for Disassembly Process Planning , 2007, 2007 IEEE International Conference on Networking, Sensing and Control.

[11]  Ravi P. Ramachandran,et al.  Vertical integration of system-on-chip concepts in the digital design curriculum , 2009, 2009 IEEE International Conference on Microelectronic Systems Education.

[12]  Takanobu Kosugi,et al.  Time to realization: Evaluation of CO2 capture technology R&Ds by GERT (Graphical Evaluation and Review Technique) analyses , 2004 .

[13]  Linda M. Head,et al.  A COMPARATIVE STUDY OF JAVA OBFUSCATORS , 2005 .

[14]  Ying Tang,et al.  Analysis of an adaptive fuzzy system for disassembly process planning , 2005, Proceedings of the 2005 IEEE International Symposium on Electronics and the Environment, 2005..

[15]  V. D. R. Guide Scheduling using drum-buffer-rope in a remanufacturing environment , 1996 .

[16]  Y. Tang,et al.  A machine learning approach for optimal disassembly planning , 2009, Int. J. Comput. Integr. Manuf..

[17]  Ying Tang,et al.  Learning-Based Disassembly Process Planner for Uncertainty Management , 2009, IEEE Transactions on Systems, Man, and Cybernetics - Part A: Systems and Humans.

[18]  MengChu Zhou,et al.  Human-in-the-Loop Disassembly Modeling and Planning , 2007 .

[19]  Ravi P. Ramachandran,et al.  Vertical Integration of System-on-Chip Concepts in the Digital Design Curriculum , 2011, IEEE Transactions on Education.

[20]  Ying Tang,et al.  Parameter estimation for optimal disassembly planning , 2007, 2007 IEEE International Conference on Systems, Man and Cybernetics.

[21]  Mark Turowski,et al.  ADAPTIVE FUZZY SYSTEM FOR DISASSEMBLY PROCESS PLANNING WITH UNCERTAINTY , 2007 .

[22]  Sachin Shetty,et al.  Game Effectiveness of Power Ville in Promoting Science and Engineering Design , 2013 .

[23]  MengChu Zhou,et al.  Design of reconfigurable semiconductor manufacturing systems with maintenance and failure , 2001, Proceedings 2001 ICRA. IEEE International Conference on Robotics and Automation (Cat. No.01CH37164).

[24]  Ying Tang Unified Colored Timed Petri net models for the adaptive control of disassembly systems , 2008, 2008 IEEE International Conference on Automation Science and Engineering.

[25]  Ying Tang,et al.  A conceptual model for a value-driven learning healthcare system , 2009, 2009 IEEE International Conference on Systems, Man and Cybernetics.

[26]  Hong Zhang,et al.  Imaps — A Multidisciplinary Aquatic Robot Project , 2007 .

[27]  Ruth Meyer,et al.  Minitab Guide to Statistics , 2004 .

[28]  Ying Tang,et al.  Attracting Women Into Electrical And Computer Engineering , 2005 .

[29]  Reggie J. Caudill,et al.  A systematic approach to disassembly line design , 2001, Proceedings of the 2001 IEEE International Symposium on Electronics and the Environment. 2001 IEEE ISEE (Cat. No.01CH37190).

[30]  S. Shetty,et al.  SustainCity - An interactive virtual reality game system , 2012, 2012 2nd Interdisciplinary Engineering Design Education Conference (IEDEC).

[31]  MengChu Zhou,et al.  Design of virtual production lines in back-end semiconductor manufacturing systems , 2000, Smc 2000 conference proceedings. 2000 ieee international conference on systems, man and cybernetics. 'cybernetics evolving to systems, humans, organizations, and their complex interactions' (cat. no.0.

[32]  Ming Chen,et al.  Life cycle of remanufactured engines , 2005 .

[33]  Ying Tang,et al.  Building An Interactive Mobile Aqua Probe System , 2006 .

[34]  Johan Östlin,et al.  Product life-cycle implications for remanufacturing strategies , 2009 .

[35]  MengChu Zhou,et al.  Intelligent decision making in disassembly process based on fuzzy reasoning Petri nets , 2004, IEEE Transactions on Systems, Man, and Cybernetics, Part B (Cybernetics).

[36]  MengChu Zhou,et al.  Disassembly Petri net approach to modeling and planning disassembly processes of electronic products , 1998, Proceedings of the 1998 IEEE International Symposium on Electronics and the Environment. ISEE - 1998 (Cat. No.98CH36145).

[37]  Su Wu,et al.  Production variability of production lines , 2007 .

[38]  R. Srivastava,et al.  Production planning and control for remanufacturing: a state - of - the - art survey , 1999 .

[39]  MengChu Zhou,et al.  Disassembly modeling, planning, and application , 2002 .

[40]  Zhao Zhong Forecasting Model for the Reusing Process of the Discarded Products Based on GERT Network Theory , 2010 .

[41]  MengChu Zhou,et al.  An integrated approach to disassembly planning and demanufacturing operation , 2001, IEEE Trans. Robotics Autom..

[42]  MengChu Zhou,et al.  Learning-Embedded Disassembly Petri Net for Process Planning , 2006, 2006 IEEE International Conference on Systems, Man and Cybernetics.

[43]  Ying Tang,et al.  Adaptive fuzzy system for disassembly process planning , 2005, Proceedings. 2005 IEEE Networking, Sensing and Control, 2005..

[44]  Mehmet Ali Ilgin,et al.  Environmentally conscious manufacturing and product recovery (ECMPRO): A review of the state of the art. , 2010, Journal of environmental management.

[45]  Luk N. Van Wassenhove,et al.  Remanufacturing as a Marketing Strategy , 2008, Manag. Sci..

[46]  Qian Yi,et al.  A new operational framework to job shop scheduling for reducing carbon emissions , 2012, 2012 IEEE International Conference on Automation Science and Engineering (CASE).

[47]  Robi Polikar,et al.  2006-959: THE ROLE OF THE ENGINEERING CLINIC IN PROMOTING AN AGILE ECE LEARNING ENVIRONMENT , 2006 .

[48]  Ying Tang,et al.  Augmented reality using spatially multiplexed structured light , 2012, 2012 19th International Conference on Mechatronics and Machine Vision in Practice (M2VIP).

[49]  Sanjay B. Joshi,et al.  A process-driven computing model for reconfigurable semiconductor manufacturing , 2008 .

[50]  Matthew Morgan,et al.  Disassembly line design with uncertainty , 2005, 2005 IEEE International Conference on Systems, Man and Cybernetics.

[51]  O. Tang,et al.  The impact of information transparency on the dynamic behaviour of a hybrid manufacturing/remanufacturing system , 2004 .

[52]  MengChu Zhou,et al.  Liveness supervision of AMS with complex processes using Petri nets , 2011, 2011 IEEE International Conference on Systems, Man, and Cybernetics.

[53]  Y. Tang *,et al.  Integrated design approach for virtual production line-based reconfigurable manufacturing systems , 2004 .

[54]  Roelof Kuik,et al.  On optimal inventory control with independent stochastic item returns , 2003, Eur. J. Oper. Res..

[55]  Luk N. Van Wassenhove,et al.  The Economics of Remanufacturing Under Limited Component Durability and Finite Product Life Cycles , 2007, Manag. Sci..

[56]  Qi Xu,et al.  Integration design of material flow management in an e-business manufacturing environment , 2006, Decis. Support Syst..

[57]  Michael E. Ketzenberg,et al.  Value of Information in Closed Loop Supply Chains , 2006 .

[59]  MengChu Zhou,et al.  Fuzzy-Petri-net-based disassembly planning considering human factors , 2004, IEEE Transactions on Systems, Man, and Cybernetics - Part A: Systems and Humans.

[60]  Ruud H. Teunter,et al.  Optimal core acquisition and remanufacturing policies under uncertain core quality fractions , 2011, Eur. J. Oper. Res..

[61]  Ruozhen Qiu,et al.  Dynamic models of closed-loop supply chain and robust H∞ control strategies , 2009 .

[62]  Beena Sukumaran,et al.  Undergraduate Research In Pollution Prevention And Sustainability , 2005 .

[63]  Ying Tang A Memory Fuzzy Learning for Uncertainty Management in Disassembly , 2006, 2006 IEEE International Conference on Networking, Sensing and Control.

[64]  Y. Tang,et al.  An On-line Probabilistic Paradigm for Optimal Disassembly Planning , 2006, 2006 IEEE International Conference on Service Operations and Logistics, and Informatics.

[65]  Dong-Ho Lee,et al.  A SIMULATION STUDY ON TELEPHONE REMANUFACTURING PROCESSES , 2001 .

[66]  Wei Wei,et al.  A generic neural network approach for filling missing data in data mining , 2003, SMC'03 Conference Proceedings. 2003 IEEE International Conference on Systems, Man and Cybernetics. Conference Theme - System Security and Assurance (Cat. No.03CH37483).

[67]  Matthew T. Karnick,et al.  A QUALITATIVE ANALYSIS OF JAVA OBFUSCATION , 2006 .

[68]  MengChu Zhou,et al.  A systematic approach to design and operation of disassembly lines , 2006, IEEE Trans Autom. Sci. Eng..

[69]  Hong Zhang,et al.  Interactive Mobile Aqua Probe & Surveillance (IMAPS) – a multidisciplinary design project , 2006 .

[70]  Ravi P. Ramachandran,et al.  Vertical integration of System-on-Chip and Green Engineering across the undergraduate curriculum , 2010, 2010 IEEE Frontiers in Education Conference (FIE).

[71]  Sachin Shetty,et al.  Adaptive virtual reality game system for personalized problem-based learning , 2011, 2011 International Conference on Networking, Sensing and Control.

[72]  Gilvan C. Souza,et al.  Multiperiod Remanufacturing Planning With Uncertain Quality of Inputs , 2010, IEEE Transactions on Engineering Management.

[74]  Sachin Shetty,et al.  Interactive Virtual Reality Games to Teaching Circuit Analysis with Metacognitive and Problem-Solving Strategies , 2011 .

[75]  MengChu Zhou,et al.  Disassembly modeling, planning and application: a review , 2000, Proceedings 2000 ICRA. Millennium Conference. IEEE International Conference on Robotics and Automation. Symposia Proceedings (Cat. No.00CH37065).

[76]  Clifford H. Thurber,et al.  Parameter estimation and inverse problems , 2005 .

[77]  Mark Turowski,et al.  Human cognitive analysis of disassembly planning using fuzzy petri nets , 2004, SPIE Optics East.

[78]  Stephen M. Disney,et al.  Bullwhip and inventory variance in a closed loop supply chain , 2006, OR Spectr..

[79]  Nesim K. Erkip,et al.  Assessing the benefits of remanufacturing option under one-way substitution and capacity constraint , 2003, Comput. Oper. Res..

[80]  Andrea Matta,et al.  Analysis of the production variability in multi-stage manufacturing systems , 2010 .

[81]  V. Guide Production planning and control for remanufacturing: industry practice and research needs , 2000 .

[82]  Sachin Shetty,et al.  A Cross-Layer Packet Loss Identification Scheme to Improve TCP Veno Performance , 2010 .

[83]  Mohamed Mohamed Naim,et al.  Dynamic performance of a hybrid inventory system with a Kanban policy in remanufacturing process , 2006 .

[84]  Baris Tan Variance of the output as a function of time: Production line dynamics , 1999, Eur. J. Oper. Res..

[85]  Gilvan C. Souza,et al.  Time Value of Commercial Product Returns , 2006, Manag. Sci..