Automatic repair of inconsistent pairwise weighting matrices in analytic hierarchy process

Abstract The public procurement process involves contractor selection, where AHP (Analytic Hierarchy Process) has been widely applied to reflect decision makers’ (DMs) preference and priority on the basis of multiple criteria. Yet, AHP was criticized that DMs often cannot provide strictly consistent comparisons in a pairwise weighting matrix (PWM). The present study proposes an automatic repair procedure for the inconsistent PWM. The procedure seeks a substitute PWM, which can pass the consistency test, and yet being as close as possible to the primitive PWM. The repair is performed by a particle swarm optimization (PSO) algorithm, whose control parameters are tuned using the Taguchi method. The proposed procedure, by automatically adjusting the PWM with the approval of DMs, can greatly facilitate the process of contractor selection and thus expedite the entire procurement function. Two practical cases are used to demonstrate the advantages of the proposed procedure, in comparison with previous work.

[1]  C. M. Tam,et al.  Comparing non-structural fuzzy decision support system and analytical hierarchy process in decision-making for construction problems , 2006, Eur. J. Oper. Res..

[2]  Genichi Taguchi,et al.  Taguchi's Quality Engineering Handbook , 2004 .

[3]  I-Tung Yang,et al.  Distribution-Free Monte Carlo Simulation: Premise and Refinement , 2008 .

[4]  Robert L. K. Tiong,et al.  Contractor Selection Criteria: Investigation of Opinions of Singapore Construction Practitioners , 2006 .

[5]  Kamal M. Al‐Subhi Al‐Harbi,et al.  Application of the AHP in project management , 2001 .

[6]  Miroslaw J. Skibniewski,et al.  Qualifier-2: Knowledge-Based System for Contractor Prequalification , 1990 .

[7]  Imtiaz Ahmed Choudhury,et al.  Application of Taguchi method in the optimization of end milling parameters , 2004 .

[8]  Arie Reich,et al.  The New Text of the Agreement on Government Procurement: An Analysis and Assessment , 2009 .

[9]  Andrea E. Olsson Particle Swarm Optimization: Theory, Techniques and Applications , 2010 .

[10]  Wei-Chih Wang,et al.  Improving AHP for construction with an adaptive AHP approach (A3) , 2008 .

[11]  Wen-Lin Tzeng,et al.  A study on the effectiveness of the most advantageous tendering method in the public works of Taiwan , 2006 .

[12]  Graham D. Vinter,et al.  Project Finance: A Legal Guide , 1994 .

[13]  Maurice Clerc,et al.  The particle swarm - explosion, stability, and convergence in a multidimensional complex space , 2002, IEEE Trans. Evol. Comput..

[14]  B. Kayis,et al.  The relative importance of tender evaluation and contractor selection criteria , 2010 .

[15]  Wun Jern Ng,et al.  Use of a Sequencing Batch Reactor for Nitrogen and Phosphorus Removal from Municipal Wastewater , 2005 .

[16]  Thomas L. Saaty,et al.  Decision making for leaders , 1985, IEEE Transactions on Systems, Man, and Cybernetics.

[17]  Chun‐Chang Lin,et al.  Evaluating bid item prices to support contractor selection ‐ a case study , 2007 .

[18]  Keith R. Molenaar,et al.  Best-Value Procurement Methods for Highway Construction Projects , 2006 .

[19]  Shu-Kai S. Fan,et al.  A genetic algorithm and a particle swarm optimizer hybridized with Nelder-Mead simplex search , 2006, Comput. Ind. Eng..

[20]  I-Tung Yang,et al.  Multiobjective optimization for manpower assignment in consulting engineering firms , 2011, Appl. Soft Comput..

[21]  Franco K.T. Cheung,et al.  Multi-criteria evaluation model for the selection of architectural consultants , 2002 .

[22]  U. Baumgartner,et al.  Particle swarm optimization - mass-spring system analogon , 2002 .

[23]  A. E. Eiben,et al.  Introduction to Evolutionary Computing , 2003, Natural Computing Series.

[24]  Evangelos Triantaphyllou,et al.  An evaluation of the eigenvalue approach for determining the membership values in fuzzy sets , 1990 .

[25]  Sherif Yehia,et al.  Hybrid Prequalification-Based, Innovative Contracting Model Using AHP , 2007 .

[26]  Edward T. Harrigan,et al.  NAtioNAl CooperAtive HigHwAy reseArCH progrAm , 2013 .

[27]  Luciana Hazin Alencar,et al.  A multiple criteria decision model for assigning priorities to activities in project management , 2009 .

[28]  Aviad Shapira,et al.  AHP-Based Equipment Selection Model for Construction Projects , 2005 .

[29]  Ekambaram Palaneeswaran,et al.  A support vector machine model for contractor prequalification , 2009 .

[30]  P. Fraser Johnson,et al.  Purchasing and Supply Management , 2001 .

[31]  Dinko Kancijan,et al.  AHP as a decision support tool in the multicriteria evaluation of bids in public procurement , 2010, Proceedings of the ITI 2010, 32nd International Conference on Information Technology Interfaces.

[32]  Y. Ilker Topcu,et al.  A decision model proposal for construction contractor selection in Turkey , 2004 .

[33]  Ofer Zwikael,et al.  Technological Invention to Product Innovation: A Project Management Approach , 2010 .

[34]  Sławomir Biruk,et al.  Assessing contractor selection criteria weights with fuzzy AHP method application in group decision environment , 2010 .

[35]  Sidhartha S. Padhi,et al.  Contractor selection in government procurement auctions: a case study , 2009 .

[36]  Phil J Hobbs,et al.  The Taguchi methodology as a statistical tool for biotechnological applications: A critical appraisal , 2008, Biotechnology journal.

[37]  Wei-Chih Wang,et al.  AHP- and simulation-based budget determination procedure for public building construction projects , 2008 .