The performance of a TBM in a squeezing ground at Uluabat, Turkey
暂无分享,去创建一个
[1] Ö. Aydan,et al. The squeezing potential of rocks around tunnels; Theory and prediction , 1993 .
[2] Georg Anagnostou,et al. Thrust force requirements for TBMs in squeezing ground , 2010 .
[3] Georg Anagnostou,et al. Tunnel boring machines under squeezing conditions , 2010 .
[4] Georg Anagnostou,et al. The Effect of Consolidation on TBM Shield Loading in Water-Bearing Squeezing Ground , 2011 .
[5] Ebrahim Farrokh,et al. Evaluation of ground convergence and squeezing potential in the TBM driven Ghomroud tunnel project , 2006 .
[6] Georg Anagnostou,et al. The Interaction Between Shield, Ground and Tunnel Support in TBM Tunnelling Through Squeezing Ground , 2011 .
[7] Ebrahim Farrokh,et al. Effect of adverse geological condition on TBM operation in Ghomroud tunnel conveyance project , 2009 .
[8] E. Hoek,et al. Predicting tunnel squeezing problems in weak heterogeneous rock masses , 2000 .
[9] K. Kovári,et al. Basic considerations on tunnelling in squeezing ground , 1996 .
[10] K. K. Panthi,et al. Uncertainty analysis of tunnel squeezing for two tunnel cases from Nepal Himalaya , 2007 .
[11] H. Copur,et al. Effect of replacing disc cutters with chisel tools on performance of a TBM in difficult ground conditions , 2012 .