Fracture critical analysis procedures and design and retrofit approaches for pony truss bridges in Ohio.
暂无分享,去创建一个
[1] Leslie G. Jaeger,et al. MULTI-LOAD-PATH STRUCTURES FOR HIGHWAY BRIDGES , 1979 .
[2] Jennifer Righman McConnell,et al. Investigation of Load-Path Redundancy in Aging Steel Bridges , 2013 .
[3] Robert J. Connor,et al. Inspection and Management of Bridges with Fracture-Critical Details , 2005 .
[4] Michel Ghosn,et al. REDUNDANCY IN HIGHWAY BRIDGE SUPERSTRUCTURES , 1998 .
[5] Robert J. Connor,et al. Evaluation of Member and Load-Path Redundancy on the US-421 Bridge Over the Ohio River , 2013 .
[6] Keith Alan Adkins,et al. A Model for Prediction of Fracture Initiation in Finite Element Analyses of Welded Steel Connections , 2014 .
[7] Jeffrey A. Laman,et al. Comparison of Experimental and Analytical Load-Rating Methodologies for a Pony-Truss Bridge , 1999 .
[8] Christopher Ryan Applebury. Reliability-based methodology for bridge inspection planning , 2011 .
[9] Dan M. Frangopol,et al. Effects of Damage and Redundancy on Structural Reliability , 1987 .
[10] T. Jankowiak,et al. Identification of parameters of concrete damage plasticity constitutive model , 2005 .
[11] Jared Daniel Schippers. A Design Procedure for Bolted Top-and-Seat Angle Connections for Use in Seismic Applications , 2012 .
[12] Dan M. Frangopol,et al. Redundancy and robustness of highway bridge superstructures and substructures , 2010, Structures and Infrastructure Systems.
[13] 김경식,et al. Guide to Stability Design Criteria for Metal Structures, 6th Edition, 2010 , 2012 .