Evaluation of Power Generation Efficiency of Cascade Hydropower Plants: A Case Study

Effective utilization of scarce water resources has presented a significant challenge to respond to the needs created by rapid economic growth in China. In this study, the efficiency of the joint operation of the Three Gorges and Gezhouba cascade hydropower plants in terms of power generation was evaluated on the basis of a precise simulation-optimization technique. The joint operation conditions of the Three Gorges and Gezhouba hydropower plants between 2004 and 2010 were utilized in this research in order to investigate the major factors that could affect power output of the cascade complex. The results showed that the current power output of the Three Gorges and Gezhouba cascade complex had already reached around 90% of the maximum theoretical value. Compared to other influencing factors evaluated in this study, the accuracy of hydrological forecasts and flood control levels can have significant impact on the power generating efficiency, whereas the navigation has a minor influence. This research provides a solid quantitative-based methodology to assess the operation efficiency of cascade hydropower plants, and more importantly, proposes potential methods that could improve the operation efficiency of cascade hydropower plants.

[1]  Jian Zuo,et al.  Sustainability in hydropower development—A case study , 2013 .

[2]  D. McKinney,et al.  Calculating the Benefits of Transboundary River Basin Cooperation: Syr Darya Basin , 2011 .

[3]  Yu Li,et al.  Joint Operation of the Multi-Reservoir System of the Three Gorges and the Qingjiang Cascade Reservoirs , 2011 .

[4]  Manfred Lenzen,et al.  Current State of Development of Electricity-Generating Technologies: A Literature Review , 2010 .

[5]  S. Stein,et al.  Evaluating reservoir operations in the Muskingum Basin. , 2008 .

[6]  John W. Labadie,et al.  Optimal Operation of Multireservoir Systems: State-of-the-Art Review , 2004 .

[7]  Slobodan P. Simonovic,et al.  Reservoir Systems Analysis: Closing Gap between Theory and Practice , 1992 .

[8]  William W.-G. Yeh,et al.  Reservoir Management and Operations Models: A State‐of‐the‐Art Review , 1985 .

[9]  A. Turgeon Optimal short-term hydro scheduling from the principle of progressive optimality , 1981 .

[10]  N. G. F. Sancho,et al.  A new algorithm for the solution of multi-state dynamic programming problems , 1975, Math. Program..

[11]  G. R. Hext,et al.  Sequential Application of Simplex Designs in Optimisation and Evolutionary Operation , 1962 .

[12]  Fu Xudong,et al.  A new approach to assess the power-generating management for cascade hydropower plants , 2011 .

[13]  Cao Guang-jing,et al.  Status and Progress of Operation Techniques Integration on Cascade Project of Three Gorges and Gezhouba , 2009 .

[14]  Zhang Jishun Discussion on Dynamic Limited Flood Water Level Control of Three Gorges Reservoir , 2007 .

[15]  Zhou Fen,et al.  Optimization of limited water level in flood season and impounding scheme for reservoir in Three Gorges Project , 2004 .

[16]  John A. Nelder,et al.  A Simplex Method for Function Minimization , 1965, Comput. J..