The analysis of coal port abnormal phenomenon activity network under generalized precedence relations
暂无分享,去创建一个
[1] Lucio Bianco,et al. A new formulation of the resource‐unconstrained project scheduling problem with generalized precedence relations to minimize the completion time , 2010, Networks.
[2] Lucio Bianco,et al. An exact algorithm to minimize the makespan in project scheduling with scarce resources and generalized precedence relations , 2012, Eur. J. Oper. Res..
[3] Lucio Bianco,et al. A new lower bound for the resource-constrained project scheduling problem with generalized precedence relations , 2011, Comput. Oper. Res..
[4] Xiaohua Xia,et al. Modeling and energy efficiency optimization of belt conveyors , 2011 .
[5] S. Elmaghraby,et al. The Analysis of Activity Networks Under Generalized Precedence Relations GPRs , 1992 .
[6] Athanasios P. Chassiakos,et al. Time-Cost Optimization of Construction Projects with Generalized Activity Constraints , 2005 .
[7] Xiaohua Xia,et al. Optimal control of operation efficiency of belt conveyor systems , 2010 .
[8] Athanasios P. Chassiakos,et al. Project time-cost analysis under generalised precedence relations , 2002 .
[9] S. Elmaghraby. An Algebra for the Analysis of Generalized Activity Networks , 1964 .