Selecting and adapting weekly work schedules with working time accounts: A case of a retail clothing chain
暂无分享,去创建一个
[1] Rudy Hung. Shiftwork scheduling algorithms with phase-delay feature , 1997 .
[2] Michael J. Brusco,et al. The effect of demand characteristics on labour scheduling methods , 1995 .
[3] Michael R. Pearce,et al. Retail sales force scheduling based on store traffic forecasting , 1998 .
[4] George B. Dantzig,et al. Letter to the Editor - A Comment on Edie's "Traffic Delays at Toll Booths" , 1954, Oper. Res..
[5] Gary M. Thompson. Assigning Telephone Operators to Shifts at New Brunswick Telephone Company , 1997 .
[6] Gilbert Laporte,et al. The art and science of designing rotating schedules , 1999, J. Oper. Res. Soc..
[7] Peter Berg,et al. Contesting Time: International Comparisons of Employee Control of Working Time , 2004 .
[8] Edieal J. Pinker,et al. Optimizing the use of contingent labor when demand is uncertain , 2003, Eur. J. Oper. Res..
[9] Gary M. Thompson. A simulated-annealing heuristic for shift scheduling using non-continuously available employees , 1996, Comput. Oper. Res..
[10] Ivo Blöchliger,et al. Modeling staff scheduling problems. A tutorial , 2004, Eur. J. Oper. Res..
[11] Andrew J. Mason,et al. Integrated Simulation, Heuristic and Optimisation Approaches to Staff Scheduling , 1998, Oper. Res..
[12] Leon F. McGinnis,et al. One- and two-phase heuristics for workforce scheduling , 1978 .
[13] Albert Corominas,et al. Multi-objective allocation of multi-function workers with lower bounded capacity , 2005, J. Oper. Res. Soc..
[14] Andreas T. Ernst,et al. An Annotated Bibliography of Personnel Scheduling and Rostering , 2004, Ann. Oper. Res..
[15] Gary M. Thompson. Labor Staffing and Scheduling Models for Controlling Service Levels , 1997 .
[16] David M. Ryan,et al. Flight Attendant Rostering for Short-Haul Airline Operations , 1997, Oper. Res..