Service Restoration In Distribution Networks Using Cyclic Best-First Search
暂无分享,去创建一个
Service restoration is an emergency control in distribution control centers to restore out-of-service area as soon as possible when a fault occurs in distribution networks. Therefore, it requires fast computation time and high quality solutions for load balancing. In this paper, a load balance index and heuristic guided best-first search are proposed for these problem. The proposed algorithm consists of two parts. One is to set up a decision tree to represent the various switching operations available. Another is to identify the most effective the set of switches using proposed search technique and a feeder load balance index. Test results on the KEPCO`s 108 bus distribution system show that the performance is efficient and robust.
[1] Yoshikazu Fukuyama,et al. Parallel genetic algorithm for service restoration in electric power distribution systems , 1996 .
[2] T. Taylor,et al. Implementation of heuristic search strategies for distribution feeder reconfiguration , 1990 .
[3] Kevin Tomsovic,et al. A heuristic search approach to feeder switching operations for overload, faults, unbalanced flow and maintenance , 1991 .